Go Solar WNY
NABCEP Certified Solar Installation Professional serving Buffalo and Western New York with rooftop, ground-mount, and battery storage solutions
2026+
Years in Business
5
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Go Solar WNY
Go Solar WNY is a solar panel installation contractor based at 301 Walnut Street, Lockport, NY 14094, serving the Buffalo and Western New York area. Owner Bob Timkey holds the highest Solar PV certification available from the North American Board of Certified Energy Practitioners (NABCEP) and is an Enphase Battery Storage Certified Installer.
Go Solar WNY is an NYSERDA NY-Sun qualified installer and an authorized installer of Panasonic rooftop and ground-mounted solar panels, including all-black arrays tilted at optimal angles to maximize electricity generation. The company also offers Panasonic Evervolt battery storage systems and energy-efficient LED lighting upgrades.
Go Solar WNY serves residential customers throughout the Buffalo metro area including Lockport, Niagara Falls, Tonawanda, Amherst, and Clarence, providing complete solar solutions from design through installation and utility interconnection.
Service Area
Go Solar WNY serves the following areas within a 50-mile radius:
Contact Information
Are you Go Solar WNY?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
5 reviews
Verified Customer
Bob and his team did an excellent job on our residential installation. NABCEP certified and it shows in the quality of work. Very knowledgeable about all the NY incentives.
Verified Customer
Go Solar WNY installed Panasonic panels on our roof and the system has been generating more than expected. Great experience from consultation to final inspection.
Verified Customer
Professional, knowledgeable, and thorough. Go Solar WNY made the whole process easy and we are very happy with our solar system. Highly recommend for WNY homeowners.
Frequently Asked Questions About Go Solar WNY
What services does Go Solar WNY offer?
Go Solar WNY offers Solar Installation, Battery Storage, Solar Design, Grid Connection.
Is Go Solar WNY NABCEP certified?
Go Solar WNY holds the following certifications: NABCEP Certified Solar Installation Professional, NYSERDA NY-Sun Qualified, Enphase Battery Storage Certified. Contact them directly for the latest accreditation details.
What areas does Go Solar WNY serve?
Go Solar WNY serves Buffalo, Lockport, Niagara Falls, Tonawanda, Amherst, Clarence. They are based in Buffalo with a service radius of 80 km.
What warranty does Go Solar WNY offer?
Go Solar WNY offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Go Solar WNY's customer reviews?
Go Solar WNY has a 5/5 rating based on 5 customer reviews. Customers consistently rate them highly.
How long has Go Solar WNY been in business?
Go Solar WNY was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Buffalo
Get a Free Solar Quote from Go Solar WNY
Fill in your details and we'll connect you with Go Solar WNY.
Quote request sent!
Go Solar WNY will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile