Golden Solar
Locally owned since 2006, designing and installing residential and commercial solar systems across Colorado
20+
Years in Business
45
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Golden Solar
Golden Solar is a locally owned solar installation company that has been designing and installing complete solar PV systems in Colorado since 2006. Headquartered at 15601 South Golden Road in Golden with a second office at 525 Bryant Street in Denver, the company serves residential and commercial customers throughout the Denver metro area and along the Front Range. With nearly two decades of experience, Golden Solar is one of the longest-operating independent solar installers in the Denver market.
The company provides full-service solar solutions including system design, installation, battery storage, maintenance, and monitoring for both residential and commercial properties. Golden Solar installs panels from REC, Canadian Solar, and Q Cells with Enphase and SolarEdge inverters, and offers Tesla Powerwall and Enphase battery storage options. The team handles every stage of the project from initial energy assessment through permitting, installation, and utility interconnection.
Golden Solar has earned a 4.6-star average rating from 45 reviews across multiple platforms. Customers frequently cite the company’s competitive pricing and efficient installation process. The company offers 25-year manufacturer warranties on panels and inverters, plus a 10-year workmanship warranty on installation labor. As one of the few Denver-area solar companies with a continuous operating history stretching back to 2006, Golden Solar provides long-term reliability for warranty support and system maintenance.
Service Area
Golden Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Golden Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
45 reviews
Chris D.
Golden Solar did a fantastic job on our system. The crew worked hard, were super efficient, and everything was in perfect order. They've been in business since 2006, which gave us confidence they'll be around for warranty support.
Linda W.
Great value for the money. Golden Solar designed a system that covers 100% of our usage. The installation was clean and the crew was respectful of our property. Would absolutely recommend.
Jeff M.
The installation went smoothly and the system is performing well. Communication during the permitting phase could have been more proactive, but the end result is solid. Competitive pricing compared to other Denver installers.
Frequently Asked Questions About Golden Solar
What services does Golden Solar offer?
Golden Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Monitoring, Commercial Solar, Energy Audit.
Is Golden Solar NABCEP certified?
Yes, Golden Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Golden Solar serve?
Golden Solar serves Denver, Golden, Lakewood, Arvada, Wheat Ridge, Littleton, Centennial, Aurora and 2 other areas. They are based in Denver with a service radius of 80 km.
What warranty does Golden Solar offer?
Golden Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Golden Solar's customer reviews?
Golden Solar has a 4.6/5 rating based on 45 customer reviews. Customers consistently rate them highly.
How long has Golden Solar been in business?
Golden Solar was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.
Similar Installers in Denver
Get a Free Solar Quote from Golden Solar
Fill in your details and we'll connect you with Golden Solar.
Quote request sent!
Golden Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile