GS

Goldin Solar

South Florida's leading solar contractor with in-house teams across Miami, Orlando, and Vero Beach

Miami, Florida
4.7 (38 reviews)
Verified
Residential Commercial

12+

Years in Business

0

38

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

8.7 / 10
Customer Reviews
94%
Certifications
90%
Experience
85%
Services Range
100%
Warranty Coverage
63%
Online Presence
75%

About Goldin Solar

Goldin Solar is a South Florida solar energy contractor founded in 2014 and headquartered at 2937 SW 27th Ave in Miami. The company operates additional offices in Orlando and Vero Beach, serving residential and commercial customers across the state. Goldin Solar handles all work with in-house sales and installation teams rather than subcontracting, which gives them direct control over project quality from design through commissioning.

The company installs Hanwha Q Cells solar panels paired with inverters from SolarEdge, Enphase, and Tesla. For backup power and energy storage, Goldin Solar offers the Tesla Powerwall 3 and Sol-Ark systems. Their services cover full-system design, permitting, installation, and post-installation monitoring. The company is a Tesla Certified Installer and holds a BBB business profile.

Goldin Solar has earned a 4.7-star rating on EnergySage from 34 reviews and carries strong marks on Yelp with 38 reviews and 64 photos. Customers frequently cite the company’s transparent pricing, responsive communication, and clean installations. The company has been recognized with industry awards and is listed as an Elite Installer on the EnergySage Marketplace.

Service Area

Goldin Solar serves the following areas within a 75-mile radius:

MiamiFort LauderdaleMiami BeachCoral GablesHialeahOrlandoVero BeachWest Palm Beach

Are you Goldin Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Monitoring
Solar Design
Energy Audit
Roof Assessment
Grid Connection

Certifications & Accreditations

BBB Accredited Tesla Certified Installer State Certified Solar Contractor

Partner Manufacturers

Panels

Hanwha Q Cells

Inverters

SolarEdgeEnphaseTesla

Batteries

Tesla PowerwallSol-Ark

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

38 reviews

Carlos M.

12 August 2025
Verified Customer

Goldin Solar made the entire process seamless. From the initial consultation to final inspection, their team was professional and knowledgeable. My electricity bill dropped by over 80% in the first month.

Jennifer L.

20 May 2025
Verified Customer

I had three quotes and Goldin stood out for their transparency. No hidden fees, no pressure tactics. The crew installed my system in one day and cleaned up everything before leaving.

David R.

15 March 2025
Verified Customer

Good installation and fair pricing. The permitting process took longer than expected, but Goldin handled all the paperwork and kept me updated throughout.

Frequently Asked Questions About Goldin Solar

What services does Goldin Solar offer?

Goldin Solar offers Solar Installation, Battery Storage, Monitoring, Solar Design, Energy Audit, Roof Assessment, Grid Connection.

Is Goldin Solar NABCEP certified?

Goldin Solar holds the following certifications: BBB Accredited, Tesla Certified Installer, State Certified Solar Contractor. Contact them directly for the latest accreditation details.

What areas does Goldin Solar serve?

Goldin Solar serves Miami, Fort Lauderdale, Miami Beach, Coral Gables, Hialeah, Orlando, Vero Beach, West Palm Beach. They are based in Miami with a service radius of 120 km.

What warranty does Goldin Solar offer?

Goldin Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Goldin Solar's customer reviews?

Goldin Solar has a 4.7/5 rating based on 38 customer reviews. Customers consistently rate them highly.

How long has Goldin Solar been in business?

Goldin Solar was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Goldin Solar

Fill in your details and we'll connect you with Goldin Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote