Green Energy Solar
MCS-accredited solar and battery specialists with a 4.9-star rating serving Cardiff and South Wales for over 10 years
12+
Years in Business
122
Customer Reviews
60 km
Service Area
11-50
Employees
SurgePV Score
About Green Energy Solar
Green Energy Solar is a solar PV design and installation company based at Unit T3, Capital Business Park, Parkway, St Mellons, Cardiff CF3 2PX. With over 10 years of experience in the solar industry, the company has built a strong reputation across South Wales and the Bristol area. They employ their own in-house installation teams rather than subcontracting, which gives them direct quality control over every project.
The company holds MCS, HIES and NAPIT accreditations, meaning customers can access the Smart Export Guarantee for payments on exported electricity. Green Energy Solar is also an approved installer for the Solar Together scheme in Wales. They design, build, install, monitor and repair bespoke solar PV systems for both residential and commercial customers.
On Trustpilot and Birdeye, Green Energy Solar holds a combined 4.9-star rating from 122 reviews, with a perfect 10/10 score from 49 reviews on Checkatrade. Customers consistently praise the installation teams by name, noting professional workmanship, tidy finishing and clear communication from first enquiry through to aftercare. The company installs Tesla Powerwall battery storage alongside solar PV systems across Cardiff, Newport, Swansea and Bristol.
Service Area
Green Energy Solar serves the following areas within a 60 km radius:
Contact Information
Are you Green Energy Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
122 reviews
Verified Customer
Absolutely delighted with the service and high standard of work from Joel, Steve and the Green Energy Solar team! From initial enquiry through to technical installation this company has been super impressive.
Verified Customer
Fantastic company. My solar and PW3 were installed quickly and efficiently. The quality of work shown by Scott, Rhys and Gethin was second to none.
Verified Customer
Installation was completed over two consecutive days by Joel and Steve who were absolutely superb. Professional, neat, tidy and knew what they were doing inside out.
Frequently Asked Questions About Green Energy Solar
What services does Green Energy Solar offer?
Green Energy Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is Green Energy Solar MCS certified?
Yes, Green Energy Solar is MCS certified and also holds HIES, NAPIT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Green Energy Solar serve?
Green Energy Solar serves Cardiff, Newport, Swansea, Bristol, Pontypridd, Barry. They are based in Cardiff with a service radius of 60 km.
What warranty does Green Energy Solar offer?
Green Energy Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Green Energy Solar's customer reviews?
Green Energy Solar has a 4.9/5 rating based on 122 customer reviews. Customers consistently rate them highly.
How long has Green Energy Solar been in business?
Green Energy Solar was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.
Similar Installers in Cardiff
Get a Free Solar Quote from Green Energy Solar
Fill in your details and we'll connect you with Green Energy Solar.
Quote request sent!
Green Energy Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile