GP

Green Power Energy

Elite-rated solar installer with over 15 years of experience serving Connecticut, New Jersey, and Pennsylvania

Hartford, Connecticut
4.9 (455 reviews)
Verified
Residential Commercial

17+

Years in Business

3,000+

Projects Completed

455

Customer Reviews

62 mi

Service Area

51-200

Employees

SurgePV Score

9.6 / 10
Customer Reviews
98%
Certifications
90%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Green Power Energy

Green Power Energy is a full-service solar installation company that has been operating since 2009 across New Jersey, Pennsylvania, and Connecticut. The company holds an Elite+ Installer rating on EnergySage with a 4.9-star average across hundreds of verified reviews. Their Connecticut office is located at 42 Ozick Drive in Durham, serving homeowners and businesses throughout the greater Hartford area, New Haven County, and Middlesex County.

The company offers solar panel installation, battery storage systems, and EV charging solutions for both residential and commercial customers. Green Power Energy is a member of the Connecticut Green Bank Contractor Network and maintains BBB accreditation. Their installation teams are NABCEP-certified, and the company works with Qcells and REC panels paired with Enphase microinverter technology.

Green Power Energy provides free site assessments, handles all permitting and utility interconnection paperwork, and offers financing options including loans and leases. Their 25-year panel and inverter warranties, combined with a 10-year workmanship guarantee, give Connecticut homeowners long-term protection on their solar investment.

Service Area

Green Power Energy serves the following areas within a 62-mile radius:

HartfordNew HavenWest HartfordMiddletownDurhamGlastonburyFarmingtonBristol

Are you Green Power Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Energy Audit
Maintenance
Grid Connection

Certifications & Accreditations

NABCEP CT Green Bank Contractor BBB Accredited

Partner Manufacturers

Panels

QcellsREC

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

455 reviews

Michael T.

12 November 2025
Verified Customer

Green Power Energy handled everything from start to finish. The crew was professional, showed up on time, and left our property clean. Our system has been producing more than estimated every month since activation.

Sandra L.

20 August 2025
Verified Customer

We compared five installers in the Hartford area and Green Power came out on top for equipment quality and price. Their design team was thorough and the permitting process went smoothly.

David R.

3 May 2025
Verified Customer

Solid installation and good communication throughout the project. The only minor issue was a scheduling delay due to weather, but the team kept us updated and the final result exceeded expectations.

Frequently Asked Questions About Green Power Energy

What services does Green Power Energy offer?

Green Power Energy offers Solar Installation, Battery Storage, EV Charging, Solar Design, Energy Audit, Maintenance, Grid Connection.

Is Green Power Energy NABCEP certified?

Yes, Green Power Energy is NABCEP certified and also holds CT Green Bank Contractor, BBB Accredited certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Green Power Energy serve?

Green Power Energy serves Hartford, New Haven, West Hartford, Middletown, Durham, Glastonbury, Farmington, Bristol. They are based in Hartford with a service radius of 100 km.

What warranty does Green Power Energy offer?

Green Power Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Green Power Energy's customer reviews?

Green Power Energy has a 4.9/5 rating based on 455 customer reviews. Customers consistently rate them highly.

How long has Green Power Energy been in business?

Green Power Energy was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Green Power Energy

Fill in your details and we'll connect you with Green Power Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote