GP

Green Power Energy

Full-service solar installer with 15+ years of experience serving New Jersey, Connecticut, and Pennsylvania homeowners

Newark, New Jersey
4.9 (455 reviews)
Verified
Residential Commercial

17+

Years in Business

0

455

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
98%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Green Power Energy

Green Power Energy is a full-service solar panel installation company headquartered at 47 East Street in Annandale, New Jersey. Founded in 2009, the company serves homeowners and businesses across New Jersey, Connecticut, and Pennsylvania. Green Power Energy is an EnergySage Elite+ Installer and holds NABCEP certification, placing it among the top-rated solar installers in the Newark metro area with a 4.9-star rating from over 455 customer reviews.

The company installs residential and commercial solar systems using premium equipment from manufacturers including REC and Silfab panels, paired with Enphase and SolarEdge inverters. Green Power Energy also installs Tesla Powerwall and Enphase IQ battery storage systems, as well as EV charging stations. The company offers flexible financing options and helps customers navigate New Jersey’s solar incentive programs including the SuSI program and net metering with PSE&G.

Green Power Energy has built a strong reputation for thorough site assessments, accurate energy production estimates, and clean installations. The company’s BBB accreditation and consistently high ratings across EnergySage, Google, and Yelp reflect over 15 years of reliable service. Customers in the Newark area frequently cite the company’s transparent pricing, knowledgeable sales consultants, and responsive post-installation support.

Service Area

Green Power Energy serves the following areas within a 75-mile radius:

NewarkAnnandaleMorristownPrincetonTrentonNew BrunswickFlemington

Are you Green Power Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Roof Assessment

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

455 reviews

Steven L.

5 October 2025
Verified Customer

Green Power Energy was the most professional solar company we talked to. Their proposal was detailed, their pricing was competitive, and the installation crew finished in one day. System has been producing exactly what they estimated.

Patricia H.

28 July 2025
Verified Customer

From the first phone call to the final inspection, everything went smoothly. The team explained all our financing options clearly and helped us pick the best equipment for our roof type. Highly recommend.

Michael R.

15 May 2025
Verified Customer

Third solar company I got a quote from and by far the best. They actually came out and assessed the roof before quoting, unlike the others who just used satellite images. The attention to detail shows in the final product.

Frequently Asked Questions About Green Power Energy

What services does Green Power Energy offer?

Green Power Energy offers Solar Installation, Battery Storage, EV Charging, Solar Design, Roof Assessment.

Is Green Power Energy NABCEP certified?

Yes, Green Power Energy is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Green Power Energy serve?

Green Power Energy serves Newark, Annandale, Morristown, Princeton, Trenton, New Brunswick, Flemington. They are based in Newark with a service radius of 120 km.

What warranty does Green Power Energy offer?

Green Power Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Green Power Energy's customer reviews?

Green Power Energy has a 4.9/5 rating based on 455 customer reviews. Customers consistently rate them highly.

How long has Green Power Energy been in business?

Green Power Energy was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Green Power Energy

Fill in your details and we'll connect you with Green Power Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote