GS

Green Solar Footprint

MCS and NICEIC certified solar PV, Tesla battery and EV charge point installer for Norwich and Norfolk

Norwich, UK
5 (20 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

20

Customer Reviews

60 km

Service Area

1-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
25%

About Green Solar Footprint

Green Solar Footprint Ltd is based at Unit 24C, Earl Road, Rackheath Industrial Estate, Rackheath, Norwich, NR13 6NT. The company specialises in the supply and installation of solar PV panels, Tesla Powerwall battery storage units, and EV charging points for residential and commercial properties across Norwich, Norfolk, and North Suffolk.

The company holds MCS, NICEIC, and RECC accreditations — a combination that confirms technical competence across electrical and renewable energy installation, and provides customers with consumer protections through the Renewable Energy Consumer Code. These certifications ensure all installations meet UK safety and quality standards, and that customers are eligible to access the Smart Export Guarantee.

Green Solar Footprint’s 5-star rating from 20 Birdeye reviews, and a 10.0/10 score from 5 Checkatrade reviews, reflect consistent quality across its residential and commercial installation portfolio. Customer feedback highlights professionalism and high-quality workmanship on every project.

The company serves the whole of Norfolk and extends into North Suffolk, covering a broad territory from its base at the Rackheath Industrial Estate just north-east of Norwich. Services include full solar PV system installation, Tesla Powerwall integration for battery storage, EV charging point installation and commissioning, and ongoing maintenance for existing systems.

Customers can contact Green Solar Footprint on 01603 559898 to arrange a site survey and quotation.

Service Area

Green Solar Footprint serves the following areas within a 60 km radius:

NorwichNorfolkRackheathNorth SuffolkGreat Yarmouth

Are you Green Solar Footprint?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS NICEIC RECC

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Green Solar Footprint

What services does Green Solar Footprint offer?

Green Solar Footprint offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Green Solar Footprint MCS certified?

Yes, Green Solar Footprint is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Green Solar Footprint serve?

Green Solar Footprint serves Norwich, Norfolk, Rackheath, North Suffolk, Great Yarmouth. They are based in Norwich with a service radius of 60 km.

What warranty does Green Solar Footprint offer?

Green Solar Footprint offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Green Solar Footprint's customer reviews?

Green Solar Footprint has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Green Solar Footprint been in business?

Green Solar Footprint was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Green Solar Footprint

Fill in your details and we'll connect you with Green Solar Footprint.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote