Greener Future Ltd
MCS-approved family-run solar installer providing domestic and commercial solutions across Southampton and Hampshire
7+
Years in Business
32
Customer Reviews
60 km
Service Area
2-10
Employees
SurgePV Score
About Greener Future Ltd
Greener Future Ltd is a family-run solar installation company headquartered at Unit 20, New Forest Enterprise Centre, Southampton, SO40 9LA. The company provides solar PV systems, battery storage, and EV charger solutions for both domestic and commercial customers across Southampton, Hampshire, and the surrounding region.
As an MCS Approved Contractor, Greener Future specialises in all types of solar installations including on-roof, in-roof, and ground-mounted panel systems. They offer inclusive quotations with no hidden charges and handle every step from initial survey through to commissioning and aftercare. The company prides itself on designing systems based on each customer’s actual energy usage and bills rather than offering one-size-fits-all packages.
Greener Future Ltd has earned a 4.9-star rating from 32 customer reviews, with consistent praise for their transparent pricing, reliable timelines, and quality workmanship. Customers regularly highlight the company’s willingness to go beyond standard installation work, including identifying and resolving pre-existing electrical issues discovered during site surveys.
Service Area
Greener Future Ltd serves the following areas within a 60 km radius:
Contact Information
Are you Greener Future Ltd?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
32 reviews
Andrew K
From first contact until installation, the Greener Future team were a joy to deal with. Everything happened when they said it would. The installation went like clockwork and their team clearly took great pride in their work.
Julia M
Dealing with them was easy and the results after the first year have been outstanding. Greener were the only ones who actually quoted based on our needs and current bills.
Pete D
Joe from Greener Future identified earthing problems during first visit and suggested optimizers needed replacing. The fault was resolved within two weeks after haunting us for almost six months.
Frequently Asked Questions About Greener Future Ltd
What services does Greener Future Ltd offer?
Greener Future Ltd offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Greener Future Ltd MCS certified?
Yes, Greener Future Ltd is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Greener Future Ltd serve?
Greener Future Ltd serves Southampton, Romsey, Totton, Lyndhurst, Eastleigh. They are based in Southampton with a service radius of 60 km.
What warranty does Greener Future Ltd offer?
Contact Greener Future Ltd directly for their current warranty terms.
How are Greener Future Ltd's customer reviews?
Greener Future Ltd has a 4.9/5 rating based on 32 customer reviews. Customers consistently rate them highly.
How long has Greener Future Ltd been in business?
Greener Future Ltd was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Southampton
Get a Free Solar Quote from Greener Future Ltd
Fill in your details and we'll connect you with Greener Future Ltd.
Quote request sent!
Greener Future Ltd will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile