GE

Greenify Energy Savers

Family-owned whole-home energy efficiency and solar installer serving the Salt Lake City area since 2012

Salt Lake City, Utah
4.7 (49 reviews)
Verified
Residential

14+

Years in Business

0

49

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

7.9 / 10
Customer Reviews
94%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About Greenify Energy Savers

Greenify Energy Savers is a family-owned energy efficiency and solar installation company founded in December 2012 and headquartered at 8535 S 700 W Suite E in Sandy, Utah. The company serves residential customers throughout the Salt Lake City metropolitan area with a whole-home approach to energy savings, combining solar installations with energy efficiency upgrades such as attic insulation, window replacements, and air sealing.

The company distinguishes itself by starting each project with a comprehensive energy audit to identify where a home is losing energy before recommending solar. This approach helps homeowners maximize the return on their solar investment by first reducing overall energy consumption. Greenify Energy Savers handles solar panel installation, battery storage, and ongoing maintenance.

Greenify Energy Savers holds an A+ rating with the Better Business Bureau, where they have been accredited since 2014. The company maintains a 4.7-star average across review platforms and has been recognized as a Market Leader by independent rating services. Customers consistently praise the company’s honest, consultative approach and quality workmanship.

Service Area

Greenify Energy Savers serves the following areas within a 50-mile radius:

Salt Lake CitySandyMidvaleWest JordanSouth JordanDraperMurrayTaylorsville

Are you Greenify Energy Savers?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Energy Audit
Maintenance

Certifications & Accreditations

BBB A+

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

49 reviews

Karen J.

25 September 2025
Verified Customer

Greenify took a whole-home approach to our energy savings. They upgraded our insulation first, then installed solar panels. The combined effect has cut our energy costs in half. Excellent family-run business.

Steve B.

10 June 2025
Verified Customer

Really appreciated how Greenify started with an energy audit before recommending solar. They identified areas where we were losing energy and addressed those first. The solar system was the final piece. Very honest company.

Diane M.

18 February 2025
Verified Customer

Good work and fair pricing. The energy audit was eye-opening and the solar installation went smoothly. Would have liked a bit more follow-up communication after the install, but the system is performing great.

Frequently Asked Questions About Greenify Energy Savers

What services does Greenify Energy Savers offer?

Greenify Energy Savers offers Solar Installation, Battery Storage, Energy Audit, Maintenance.

Is Greenify Energy Savers NABCEP certified?

Greenify Energy Savers holds the following certifications: BBB A+. Contact them directly for the latest accreditation details.

What areas does Greenify Energy Savers serve?

Greenify Energy Savers serves Salt Lake City, Sandy, Midvale, West Jordan, South Jordan, Draper, Murray, Taylorsville. They are based in Salt Lake City with a service radius of 80 km.

What warranty does Greenify Energy Savers offer?

Greenify Energy Savers offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Greenify Energy Savers's customer reviews?

Greenify Energy Savers has a 4.7/5 rating based on 49 customer reviews. Customers consistently rate them highly.

How long has Greenify Energy Savers been in business?

Greenify Energy Savers was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Greenify Energy Savers

Fill in your details and we'll connect you with Greenify Energy Savers.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote