GN

Grid Neutral

Sheffield's 5-star rated solar panel and battery storage specialists

Sheffield, UK
5 (45 reviews)
Verified
Residential Commercial Industrial

7+

Years in Business

750+

Projects Completed

45

Customer Reviews

80 km

Service Area

2-10

Employees

SurgePV Score

7.3 / 10
Customer Reviews
100%
Certifications
60%
Experience
70%
Services Range
75%
Warranty Coverage
60%
Online Presence
50%

About Grid Neutral

Grid Neutral is a Sheffield-based renewable energy installer with a 100% five-star review record across customer feedback platforms. Founded in 2019, the company has completed over 750 installations for residential, commercial, and industrial clients across South Yorkshire and the East Midlands. Their office is located on Sidney Street in Sheffield city centre, with an additional base in Worksop, Nottinghamshire.

The company is MCS-certified and handles every stage of the solar installation process, from initial site survey and system design through to installation, commissioning, and aftercare. Grid Neutral works with both domestic homeowners and commercial clients, offering solar PV systems, battery storage solutions, and ongoing maintenance and repair services. Their team has more than 10 years of combined experience in the renewables sector.

Grid Neutral’s service area covers Sheffield, Rotherham, Doncaster, Barnsley, Chesterfield, and extends into Derbyshire, Lincolnshire, and Nottinghamshire. The company’s consistent record of five-star feedback reflects their commitment to transparent pricing, quality workmanship, and responsive customer service.

Service Area

Grid Neutral serves the following areas within a 80 km radius:

SheffieldRotherhamDoncasterBarnsleyChesterfieldNottingham

Are you Grid Neutral?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

10 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

45 reviews

Paul Andrews

15 November 2025
Verified Customer

Fantastic from the initial consultation right through to commissioning. The system was installed in a day and has been performing above expectations ever since.

Claire Dawson

22 August 2025
Verified Customer

Grid Neutral were brilliant. No hard sell, just honest advice and a quality installation. The team were punctual, professional, and left the property spotless.

Frequently Asked Questions About Grid Neutral

What services does Grid Neutral offer?

Grid Neutral offers Solar Installation, Battery Storage, Maintenance.

Is Grid Neutral MCS certified?

Yes, Grid Neutral is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Grid Neutral serve?

Grid Neutral serves Sheffield, Rotherham, Doncaster, Barnsley, Chesterfield, Nottingham. They are based in Sheffield with a service radius of 80 km.

What warranty does Grid Neutral offer?

Grid Neutral offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.

How are Grid Neutral's customer reviews?

Grid Neutral has a 5/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has Grid Neutral been in business?

Grid Neutral was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Grid Neutral

Fill in your details and we'll connect you with Grid Neutral.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote