HE

HC Electrical Yorkshire

MCS-certified solar PV installers serving homes and businesses across West Yorkshire

Leeds, UK
4.8 (32 reviews)
Verified
Residential Commercial

5+

Years in Business

32

Customer Reviews

50 km

Service Area

2-10

Employees

SurgePV Score

7.2 / 10
Customer Reviews
96%
Certifications
60%
Experience
70%
Services Range
75%
Warranty Coverage
53%
Online Presence
50%

About HC Electrical Yorkshire

HC Electrical Yorkshire Limited is an established electrical contracting company based in Castleford, West Yorkshire. Incorporated in 2021, the company works with homeowners and businesses throughout West Yorkshire who are looking to switch to renewable solar PV systems. HC Electrical Yorkshire holds MCS certification for solar PV installations, ensuring all systems qualify for Smart Export Guarantee payments and government incentive schemes.

As specialist electrical contractors, the team has experience with solar PV systems of all sizes and complexities, from small one-bedroom houses to large commercial installations. The company handles the full installation process from initial site survey and system design through to installation, commissioning, and aftercare. They also offer battery storage and EV charging point installations alongside their solar PV services.

HC Electrical Yorkshire serves customers across West Yorkshire including Leeds, Castleford, Wakefield, Pontefract, and Bradford. The company has built a strong reputation for reliable workmanship, clear communication, and competitive pricing, with consistently positive feedback from both residential and commercial clients.

Service Area

HC Electrical Yorkshire serves the following areas within a 50 km radius:

LeedsCastlefordWakefieldPontefractBradford

Are you HC Electrical Yorkshire?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

10 years

Installation Warranty

5 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.8

32 reviews

Kevin Shaw

14 October 2025
Verified Customer

HC Electrical did a brilliant job on our solar installation. Professional from start to finish, and the system is generating more than we expected. Highly recommend.

Joanne Marshall

30 June 2025
Verified Customer

Great company. They took the time to explain everything, kept us informed at every stage, and left the property spotless. Very happy with our new solar panels.

Frequently Asked Questions About HC Electrical Yorkshire

What services does HC Electrical Yorkshire offer?

HC Electrical Yorkshire offers Solar Installation, Battery Storage, EV Charging.

Is HC Electrical Yorkshire MCS certified?

Yes, HC Electrical Yorkshire is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does HC Electrical Yorkshire serve?

HC Electrical Yorkshire serves Leeds, Castleford, Wakefield, Pontefract, Bradford. They are based in Leeds with a service radius of 50 km.

What warranty does HC Electrical Yorkshire offer?

HC Electrical Yorkshire offers 25-year panel warranty, 10-year inverter warranty, and 5-year installation/workmanship warranty.

How are HC Electrical Yorkshire's customer reviews?

HC Electrical Yorkshire has a 4.8/5 rating based on 32 customer reviews. Customers consistently rate them highly.

How long has HC Electrical Yorkshire been in business?

HC Electrical Yorkshire was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.

Get a Free Solar Quote from HC Electrical Yorkshire

Fill in your details and we'll connect you with HC Electrical Yorkshire.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote