HE

Hosie Electrical

MCS certified solar PV installers in Aberdeen and Aberdeenshire since 1988

Aberdeen, UK
0 (0 reviews)
Verified
Residential Commercial Industrial

38+

Years in Business

0

60 km

Service Area

11-50

Employees

SurgePV Score

6.3 / 10
Customer Reviews
0%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Hosie Electrical

Hosie Electrical Contracting Ltd was established in 1988 and has built a strong reputation across Aberdeen, Inverurie, and the wider Aberdeenshire region for commercial, industrial, and domestic electrical contracting. The company is headquartered at 1A Wallace Road, Inverurie, Aberdeenshire, AB51 3WS.

The solar PV division operates with a dedicated team of fully trained PV engineers who carry out installations throughout Aberdeen City and the surrounding shire. Hosie Electrical holds MCS certification for solar panel installations, which is required for customers to access the Smart Export Guarantee and ensures all work meets national quality standards. The company is also SELECT and NICEIC approved, reflecting its broader electrical contracting credentials.

Services offered include solar PV system installation for domestic properties, commercial buildings, and industrial premises, along with battery storage integration and ongoing maintenance. The experienced team handles system design, roof surveying, grid connection, and commissioning, providing a complete service from the first survey through to handover.

Customer feedback consistently highlights Hosie Electrical’s high standard of workmanship, competitive pricing, and professional attitude. The company is recognised for its personal service and ability to tailor systems to the needs of each client — whether a residential homeowner in Inverurie or a commercial operator in Aberdeen City.

Hosie Electrical’s decades of experience as an electrical contractor underpin their solar work, giving customers confidence that both the electrical and structural aspects of any installation will be handled correctly.

Service Area

Hosie Electrical serves the following areas within a 60 km radius:

AberdeenInverurieAberdeenshirePeterheadHuntly

Are you Hosie Electrical?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

MCS NICEIC SELECT

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Hosie Electrical

What services does Hosie Electrical offer?

Hosie Electrical offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is Hosie Electrical MCS certified?

Yes, Hosie Electrical is MCS certified and also holds NICEIC, SELECT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Hosie Electrical serve?

Hosie Electrical serves Aberdeen, Inverurie, Aberdeenshire, Peterhead, Huntly. They are based in Aberdeen with a service radius of 60 km.

What warranty does Hosie Electrical offer?

Hosie Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Hosie Electrical's customer reviews?

Hosie Electrical does not have any reviews yet. Be the first to leave a review after using their services.

How long has Hosie Electrical been in business?

Hosie Electrical was founded in 1988 and has been in business for 38 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Hosie Electrical

Fill in your details and we'll connect you with Hosie Electrical.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote