Insolation Solar
Best Solar Company in Wolverhampton — MCS, RECC, Tesla Certified and Octopus Energy Trusted Partner
6+
Years in Business
60 km
Service Area
2-10
Employees
SurgePV Score
About Insolation Solar
Insolation Solar Ltd is a family-owned renewable energy company based at Wombourne House, Unit 1, Heath Mill Road, Wombourne, WV5 8BD, serving Wolverhampton and the wider West Midlands region. The company was incorporated in December 2020 and draws on over 14 years of combined industry experience within its founding team. Directors Howard and Wendy run the company directly, providing hands-on customer service throughout every stage of each project.
The company holds MCS and RECC accreditations, is TrustMark registered, and is both a Tesla Certified Installer and an Octopus Energy Trusted Partner. These credentials confirm Insolation Solar’s technical competence and allow customers to access Octopus Energy’s smart tariffs in conjunction with their new solar system.
In the Industry Oversight Report 2024, Insolation Solar was named the Best Solar Panel Installer in Wolverhampton. The company was evaluated against 50 top West Midlands contractors across a 150-point inspection covering grid-tied, off-grid, and hybrid system installations. The award reflects consistent positive outcomes across residential installations, commercial projects for retail units, warehouses, office buildings, and manufacturing facilities.
Customer reviews highlight the thorough survey and design process, the directors’ deep product knowledge, and the clean, professional installations delivered by the field team. Aftercare support and ongoing monitoring guidance are frequently praised as genuinely helpful.
Service Area
Insolation Solar serves the following areas within a 60 km radius:
Contact Information
Are you Insolation Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
0
0 reviews
Alison T.
Howard and Wendy provided exceptional customer service from the initial survey through to aftercare. They were patient in explaining how the system would work best for our needs.
Colin M.
Communication throughout the planning and installation process was excellent. The installation team were professional and respectful, with great post-install support.
Rachel K.
Exceptional quality, customer service, and great value from a local family company. They took the time to understand our needs and the system has been performing brilliantly.
Frequently Asked Questions About Insolation Solar
What services does Insolation Solar offer?
Insolation Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is Insolation Solar MCS certified?
Yes, Insolation Solar is MCS certified and also holds RECC, TrustMark, Tesla Certified certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Insolation Solar serve?
Insolation Solar serves Wolverhampton, Wombourne, Walsall, Dudley, Birmingham, Telford, Stafford. They are based in Wolverhampton with a service radius of 60 km.
What warranty does Insolation Solar offer?
Insolation Solar offers 10-year installation/workmanship warranty.
How are Insolation Solar's customer reviews?
Insolation Solar does not have any reviews yet. Be the first to leave a review after using their services.
How long has Insolation Solar been in business?
Insolation Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Wolverhampton
Get a Free Solar Quote from Insolation Solar
Fill in your details and we'll connect you with Insolation Solar.
Quote request sent!
Insolation Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile