Intermountain Wind & Solar
Leading NABCEP-certified solar and wind energy installer serving Utah, Idaho, Wyoming, and Oregon since 2008
18+
Years in Business
50
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About Intermountain Wind & Solar
Intermountain Wind & Solar is a renewable energy company founded in 2008 and headquartered at 1041 N 950 W Suite 500 in Centerville, Utah. The company serves residential and commercial customers across Utah, Idaho, Wyoming, and Oregon. Intermountain Wind & Solar was named one of the top 500 solar contractors in the United States every year from 2014 through 2017.
The company employs NABCEP-certified solar technicians and handles all project phases in-house, from initial site assessment and system design through installation, permitting, and ongoing maintenance. Intermountain Wind & Solar installs panels from Silfab, REC, and Canadian Solar alongside SolarEdge and Enphase inverters and Tesla Powerwall battery storage systems.
Intermountain Wind & Solar holds an A+ rating with the Better Business Bureau and maintains positive reviews across multiple platforms. The company offers 25-year manufacturer warranties on panels and inverters plus a 10-year workmanship warranty on installations. They also provide EV charging station installation and long-term system monitoring services.
Service Area
Intermountain Wind & Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Intermountain Wind & Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.3
50 reviews
Brian M.
Intermountain Wind & Solar installed a 9.6 kW system on our Centerville home. The NABCEP-certified team was professional and the installation was completed ahead of schedule. Production has matched their estimates exactly.
Lisa S.
Good experience overall. The system design was well thought out and uses quality Silfab panels. There was a short delay in scheduling the install, but once the crew showed up the work was done in one day.
Carlos G.
Chose them for commercial solar on our warehouse. The project was large and complex but the team handled permitting and utility interconnection smoothly. System is generating savings as projected.
Frequently Asked Questions About Intermountain Wind & Solar
What services does Intermountain Wind & Solar offer?
Intermountain Wind & Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Commercial Solar.
Is Intermountain Wind & Solar NABCEP certified?
Yes, Intermountain Wind & Solar is NABCEP certified and also holds BBB A+ certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Intermountain Wind & Solar serve?
Intermountain Wind & Solar serves Salt Lake City, Centerville, Ogden, Provo, Park City, Logan, Boise. They are based in Salt Lake City with a service radius of 200 km.
What warranty does Intermountain Wind & Solar offer?
Intermountain Wind & Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Intermountain Wind & Solar's customer reviews?
Intermountain Wind & Solar has a 4.3/5 rating based on 50 customer reviews. They are well-regarded by their customers.
How long has Intermountain Wind & Solar been in business?
Intermountain Wind & Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Salt Lake City
Get a Free Solar Quote from Intermountain Wind & Solar
Fill in your details and we'll connect you with Intermountain Wind & Solar.
Quote request sent!
Intermountain Wind & Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile