IS

ION Solar

Full-service residential solar installer with in-house operations serving Salt Lake City and communities across the United States

Salt Lake City, Utah
4 (150 reviews)
Verified
Residential

13+

Years in Business

0

150

Customer Reviews

93 mi

Service Area

51-200

Employees

SurgePV Score

7.8 / 10
Customer Reviews
80%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About ION Solar

ION Solar is a residential solar installation company founded in 2013 with headquarters at 4801 N University Ave Suite 900 in Provo, Utah. The company operates as a full-service, in-house solar provider, meaning they do not outsource any part of the design, engineering, permitting, or installation process to subcontractors. ION Solar serves homeowners across Salt Lake City and multiple states.

The company handles every step of the solar process internally, from initial consultation and custom system design through electrical work, installation, and utility interconnection. ION Solar offers battery storage options alongside standard solar panel systems and provides a monitoring platform that lets homeowners track their energy production in real time.

ION Solar is BBB accredited and has grown to become one of the larger solar installers in Utah. The company maintains a customer support team available via phone, email, and live chat to assist homeowners with questions about their systems. ION Solar offers 25-year manufacturer warranties on equipment and a 10-year workmanship warranty on installations.

Service Area

ION Solar serves the following areas within a 93-mile radius:

Salt Lake CityProvoOremOgdenSandyWest JordanLehiPark City

Are you ION Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Monitoring

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4

150 reviews

Jared P.

28 October 2025
Verified Customer

ION Solar installed a system on our home in about three weeks from signing. The team was professional and the system has been performing above expectations. Their monitoring app makes it easy to track production.

Emily A.

12 July 2025
Verified Customer

Good experience with ION Solar. The sales rep was knowledgeable and the installation crew was efficient. The system is working well after four months. Customer support responded quickly when I had questions.

Daniel C.

20 March 2025
Verified Customer

Solid company with a smooth process from consultation to activation. The in-house approach means they control the quality at every step. Minor scheduling delay but the final result is great.

Frequently Asked Questions About ION Solar

What services does ION Solar offer?

ION Solar offers Solar Installation, Battery Storage, Solar Design, Monitoring.

Is ION Solar NABCEP certified?

ION Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does ION Solar serve?

ION Solar serves Salt Lake City, Provo, Orem, Ogden, Sandy, West Jordan, Lehi, Park City. They are based in Salt Lake City with a service radius of 150 km.

What warranty does ION Solar offer?

ION Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are ION Solar's customer reviews?

ION Solar has a 4/5 rating based on 150 customer reviews. They are well-regarded by their customers.

How long has ION Solar been in business?

ION Solar was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from ION Solar

Fill in your details and we'll connect you with ION Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote