JC Solar
Experienced solar roofing contractor serving Philadelphia with 15+ years in the residential solar industry
16+
Years in Business
30
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About JC Solar
JC Solar is a residential solar roofing contractor that serves the Philadelphia, Pennsylvania market along with Maryland, Delaware, Virginia, and Arizona. With over 15 years of experience in the residential solar industry, the company specializes in combining roof replacement and solar panel installation into a single, coordinated project, reducing overall cost and disruption for homeowners.
The company provides professional solar panel installation services including system design, roof assessment, permitting, installation, and ongoing maintenance. JC Solar installs panels from REC and Canadian Solar with Enphase and SolarEdge inverters and Enphase battery storage. The company’s roofing expertise allows it to assess and address roof conditions before solar installation, preventing potential issues that solar-only companies may overlook.
JC Solar maintains a 4.7-star average rating with customers highlighting the company’s combined roofing and solar expertise as a key differentiator. The team’s ability to identify and resolve roof problems prior to panel installation gives homeowners confidence that their solar investment is protected for the long term. The company offers a 25-year panel warranty, 25-year inverter warranty, and 10-year workmanship guarantee.
Service Area
JC Solar serves the following areas within a 62-mile radius:
Contact Information
Are you JC Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
30 reviews
Christine R.
JC Solar replaced our aging roof and installed solar panels at the same time, which saved us money compared to doing the projects separately. The coordination was seamless and both the roof and panels look great.
Mark B.
Eric and the JC Solar team were thorough from the initial inspection through final commissioning. They identified a roof issue that other solar companies had missed and addressed it before installation. Very professional.
Laura S.
Good experience overall. The combined roofing and solar approach made a lot of sense for our older home. Installation took slightly longer than quoted but the quality was excellent. Happy with the system performance.
Frequently Asked Questions About JC Solar
What services does JC Solar offer?
JC Solar offers Solar Installation, Solar Design, Roof Assessment, solar_roofing, Maintenance.
Is JC Solar NABCEP certified?
Yes, JC Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does JC Solar serve?
JC Solar serves Philadelphia, Wilmington, Baltimore, King of Prussia, Cherry Hill. They are based in Philadelphia with a service radius of 100 km.
What warranty does JC Solar offer?
JC Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are JC Solar's customer reviews?
JC Solar has a 4.7/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has JC Solar been in business?
JC Solar was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Philadelphia
Get a Free Solar Quote from JC Solar
Fill in your details and we'll connect you with JC Solar.
Quote request sent!
JC Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile