JTE Solar
Nashville's locally owned solar and battery installer established in 2017, specializing in residential energy solutions
9+
Years in Business
15
Customer Reviews
62 mi
Service Area
1-10
Employees
SurgePV Score
About JTE Solar
JTE Solar Inc. is a Nashville-based solar installation company established in 2017, operating from 220 Great Circle Road, Suite 140, in Nashville. Originally founded as Jacob the Electrician LLC, the company expanded into solar energy and now provides residential solar panel installations, home energy design, battery backup systems, and maintenance services across Middle Tennessee.
JTE Solar combines its electrical contracting background with solar expertise, offering customers a team that understands both the electrical and structural aspects of solar installations. The company installs panels from Qcells and Canadian Solar with Enphase microinverters and Tesla Powerwall battery storage. JTE handles system design, permitting, installation, and post-installation monitoring for residential clients.
Customers consistently give JTE Solar high marks for professionalism, product knowledge, and organized installation processes. The company’s five-star reviews highlight helpful customer support and thorough explanations of system design and equipment options. JTE Solar serves Nashville, Franklin, Brentwood, Hendersonville, Murfreesboro, and surrounding communities.
Service Area
JTE Solar serves the following areas within a 62-mile radius:
Contact Information
Are you JTE Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
15 reviews
Hannah L.
JTE Solar was professional from the initial consultation to the final walkthrough. The team explained every aspect of the system design and the installation was completed without any issues. Highly recommended.
Matt C.
The organized installation process and helpful customer support made the whole experience stress-free. Our system has been producing well and the monitoring setup was straightforward.
Sharon W.
Product knowledge and customer service were both excellent. The team took time to answer all our questions about panel placement and battery sizing. The system is performing as promised.
Frequently Asked Questions About JTE Solar
What services does JTE Solar offer?
JTE Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Grid Connection.
Is JTE Solar NABCEP certified?
JTE Solar holds the following certifications: Licensed Electrician. Contact them directly for the latest accreditation details.
What areas does JTE Solar serve?
JTE Solar serves Nashville, Franklin, Brentwood, Hendersonville, Murfreesboro, Smyrna, Lebanon. They are based in Nashville with a service radius of 100 km.
What warranty does JTE Solar offer?
JTE Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are JTE Solar's customer reviews?
JTE Solar has a 4.8/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has JTE Solar been in business?
JTE Solar was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Nashville
Get a Free Solar Quote from JTE Solar
Fill in your details and we'll connect you with JTE Solar.
Quote request sent!
JTE Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile