LE

LightSkye Energy

BBB-accredited solar installer serving Metro Detroit with Q-Cell panels and Tesla battery solutions

Detroit, Michigan
4.9 (95 reviews)
Verified
Residential Commercial

6+

Years in Business

400+

Projects Completed

95

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8 / 10
Customer Reviews
98%
Certifications
60%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About LightSkye Energy

LightSkye Energy is a solar installation company based in Macomb County, Michigan, providing residential and commercial solar panel systems across Wayne, Oakland, and Macomb counties. The company designs efficient systems featuring Q-Cell solar panels paired with Enphase microinverters and offers battery storage solutions from both Tesla and Franklin for homeowners seeking energy independence and backup power capability.

LightSkye Energy handles every stage of the solar installation process, including site evaluation, custom system design, permitting, professional installation, and utility interconnection. The company also provides ongoing monitoring and maintenance services to ensure long-term system performance. Their mobile app allows homeowners to track energy production and consumption in real time.

The company holds Better Business Bureau accreditation with a top rating for reliability and customer satisfaction, and maintains a 4.9 out of 5 star average from verified customer reviews. LightSkye Energy’s service area covers the primary Metro Detroit tri-county region, including communities such as Sterling Heights, Warren, Troy, Rochester Hills, and Clinton Township, making them accessible to homeowners throughout southeastern Michigan.

Service Area

LightSkye Energy serves the following areas within a 50-mile radius:

DetroitMacombSterling HeightsWarrenTroyRochester HillsClinton TownshipShelby TownshipUticaChesterfield

Are you LightSkye Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Monitoring
Maintenance

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Panels

Q Cells

Inverters

Enphase

Batteries

Tesla PowerwallFranklin

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

95 reviews

Rachel S.

8 September 2025
Verified Customer

LightSkye made the whole process easy and stress-free. They designed a system that fits our budget and energy needs perfectly. The Q-Cell panels look great on our roof and the Tesla Powerwall gives us backup power during outages.

Mark T.

22 May 2025
Verified Customer

Very impressed with the professionalism and knowledge of the LightSkye team. They explained everything clearly, from panel placement to expected production. Our system has been exceeding projections by about 10% since it was turned on.

Nicole K.

14 January 2025
Verified Customer

We had a great experience from consultation through installation. The crew was clean, efficient, and finished on time. The monitoring app they set up lets us track production in real time. Highly recommend for anyone in Macomb County.

Frequently Asked Questions About LightSkye Energy

What services does LightSkye Energy offer?

LightSkye Energy offers Solar Installation, Battery Storage, Solar Design, Monitoring, Maintenance.

Is LightSkye Energy NABCEP certified?

LightSkye Energy holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does LightSkye Energy serve?

LightSkye Energy serves Detroit, Macomb, Sterling Heights, Warren, Troy, Rochester Hills, Clinton Township, Shelby Township and 2 other areas. They are based in Detroit with a service radius of 80 km.

What warranty does LightSkye Energy offer?

LightSkye Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are LightSkye Energy's customer reviews?

LightSkye Energy has a 4.9/5 rating based on 95 customer reviews. Customers consistently rate them highly.

How long has LightSkye Energy been in business?

LightSkye Energy was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from LightSkye Energy

Fill in your details and we'll connect you with LightSkye Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote