LP

Lunex Power

Trusted solar and electrical solutions for homes and businesses — 4,000+ customers across six states

Worcester, Massachusetts
4.6 (45 reviews)
Residential Commercial off-grid

8+

Years in Business

4,000+

Projects Completed

45

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

6.9 / 10
Customer Reviews
92%
Certifications
0%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Lunex Power

Lunex Power is a solar and electrical services company with a Worcester office at 95 Prescott Street, Suite 106 in Worcester, MA. The company serves over 4,000 customers across Massachusetts, Connecticut, Rhode Island, Florida, Colorado, and the Carolinas, providing solar installations, battery storage, EV charging, and electrical repairs.

Lunex Power handles residential and commercial solar projects as well as off-grid installations. The company offers turnkey service from initial consultation through permitting, installation, and utility interconnection. Their team includes licensed electricians who handle both the solar and electrical components of each project.

The Worcester office serves the Central Massachusetts region and is open Monday through Saturday from 7 AM to 7 PM. Lunex Power guides customers through Massachusetts solar incentives, financing options, and the net metering process.

Service Area

Lunex Power serves the following areas within a 50-mile radius:

WorcesterBostonSpringfieldProvidenceHartford

Are you Lunex Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Solar Design

Partner Manufacturers

Inverters

Enphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

45 reviews

James H.

1 September 2025
Verified Customer

Lunex Power installed our 10 kW system in Worcester and handled everything from permits to utility interconnection. The team was knowledgeable about Massachusetts incentives and net metering.

Patricia F.

18 June 2025
Verified Customer

Solid installation and good customer service. The system has been producing as estimated. They also helped us add a battery backup for power outages.

Robert C.

14 February 2025
Verified Customer

We chose Lunex for our commercial solar project and they delivered on time and on budget. Their electrical expertise made a real difference in the quality of the installation.

Frequently Asked Questions About Lunex Power

What services does Lunex Power offer?

Lunex Power offers Solar Installation, Battery Storage, EV Charging, Maintenance, Solar Design.

Is Lunex Power NABCEP certified?

Lunex Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Lunex Power serve?

Lunex Power serves Worcester, Boston, Springfield, Providence, Hartford. They are based in Worcester with a service radius of 80 km.

What warranty does Lunex Power offer?

Lunex Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Lunex Power's customer reviews?

Lunex Power has a 4.6/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has Lunex Power been in business?

Lunex Power was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Lunex Power

Fill in your details and we'll connect you with Lunex Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote