MS

Masterpiece Solar

Five-star rated Jacksonville solar consultancy delivering professional residential and commercial installations

Jacksonville, Florida
5 (20 reviews)
Verified
Residential Commercial

6+

Years in Business

0

20

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
75%
Experience
70%
Services Range
100%
Warranty Coverage
63%
Online Presence
75%

About Masterpiece Solar

Masterpiece Solar is a Jacksonville-based solar consultancy and installation company operating from 50 North Laura Street in downtown Jacksonville. The company works with homeowners and business owners on residential and commercial solar projects, providing system design, installation, and ongoing support. Masterpiece Solar is also one of the few local companies offering solar panel removal and reinstallation services for roof replacements.

The company installs Qcells and Canadian Solar panels with Enphase microinverters and offers Tesla Powerwall and Enphase IQ battery storage options. Masterpiece Solar is BBB Accredited and a member of the St. Johns County Chamber of Commerce. The consultative approach means each project begins with an energy usage analysis and customized system recommendation rather than a one-size-fits-all solution.

Masterpiece Solar holds the highest rating among local Jacksonville solar companies at 5.0 stars. Customers praise the seamless installation process, professional communication, and attention to detail. The company serves Jacksonville, St. Augustine, Jacksonville Beach, Ponte Vedra Beach, Orange Park, and Fernandina Beach.

Service Area

Masterpiece Solar serves the following areas within a 62-mile radius:

JacksonvilleSt. AugustineJacksonville BeachPonte Vedra BeachOrange ParkFernandina Beach

Are you Masterpiece Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Maintenance
solar_panel_removal

Certifications & Accreditations

BBB Accredited St. Johns County Chamber Member

Partner Manufacturers

Panels

QcellsCanadian Solar

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

20 reviews

Patricia K.

1 October 2025
Verified Customer

Masterpiece Solar provided a great consultation and the installation was professional and seamless. The team took care of every detail from permitting to final inspection.

Robert M.

18 July 2025
Verified Customer

The consultative approach was a standout. Instead of pushing a specific system, they analyzed our energy usage and recommended the right size and equipment. Production has exceeded expectations.

Diana L.

12 April 2025
Verified Customer

Masterpiece handled our solar panel removal and reinstall during a roof replacement. The process was smooth and the panels went back up without any issues. Excellent service from start to finish.

Frequently Asked Questions About Masterpiece Solar

What services does Masterpiece Solar offer?

Masterpiece Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Maintenance, solar_panel_removal.

Is Masterpiece Solar NABCEP certified?

Masterpiece Solar holds the following certifications: BBB Accredited, St. Johns County Chamber Member. Contact them directly for the latest accreditation details.

What areas does Masterpiece Solar serve?

Masterpiece Solar serves Jacksonville, St. Augustine, Jacksonville Beach, Ponte Vedra Beach, Orange Park, Fernandina Beach. They are based in Jacksonville with a service radius of 100 km.

What warranty does Masterpiece Solar offer?

Masterpiece Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Masterpiece Solar's customer reviews?

Masterpiece Solar has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Masterpiece Solar been in business?

Masterpiece Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Masterpiece Solar

Fill in your details and we'll connect you with Masterpiece Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote