MK Solar Energy
Residential and commercial solar panel installers serving Milton Keynes and surrounding areas
2026+
Years in Business
40 km
Service Area
1-10
Employees
SurgePV Score
About MK Solar Energy
MK Solar Energy is a solar panel installer based in Tamworth Stubb, Milton Keynes, serving residential and commercial clients across Milton Keynes and the surrounding areas. The company can be reached by phone on 07813 165754 or by email at [email protected].
The company provides solar PV installation and battery storage solutions with certified installers. MK Solar Energy works with homeowners and businesses in Milton Keynes, Northampton, and Bedford looking to reduce their energy costs and carbon footprint.
Services include tailored system design, professional installation, and handover documentation including MCS certificates required for Smart Export Guarantee registration.
Service Area
MK Solar Energy serves the following areas within a 40 km radius:
Contact Information
Are you MK Solar Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About MK Solar Energy
What services does MK Solar Energy offer?
MK Solar Energy offers Solar Installation, Battery Storage.
Is MK Solar Energy MCS certified?
Yes, MK Solar Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does MK Solar Energy serve?
MK Solar Energy serves Milton Keynes, Northampton, Bedford. They are based in Milton Keynes with a service radius of 40 km.
What warranty does MK Solar Energy offer?
MK Solar Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are MK Solar Energy's customer reviews?
MK Solar Energy does not have any reviews yet. Be the first to leave a review after using their services.
How long has MK Solar Energy been in business?
MK Solar Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Milton Keynes
Get a Free Solar Quote from MK Solar Energy
Fill in your details and we'll connect you with MK Solar Energy.
Quote request sent!
MK Solar Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile