Namaste Solar
Colorado's largest employee-owned solar company with 20+ years of experience and 14,000+ projects completed
21+
Years in Business
14,000+
Projects Completed
520
Customer Reviews
62 mi
Service Area
201-500
Employees
SurgePV Score
About Namaste Solar
Namaste Solar is Colorado’s largest locally owned solar company, founded in 2005 in Boulder. The company is 100% employee-owned and a Certified B Corporation, reflecting its commitment to people and the planet alongside profitability. With offices in both Boulder and Denver, Namaste Solar has completed over 14,000 residential and commercial projects totaling more than 205 MW of installed capacity across the Colorado Front Range.
The company offers full-service solar installation for homes and businesses, including system design, permitting, installation, battery storage, and ongoing monitoring. Namaste Solar employs NABCEP-certified installers and partners with leading equipment manufacturers including REC and Silfab panels, Enphase and SolarEdge inverters, and Tesla Powerwall battery systems. All installations include free monitoring so homeowners can track system performance in real time.
Namaste Solar has earned numerous awards, including the People’s Choice Award for Boulder County Solar Company and Top Company: Energy from Colorado Biz Magazine. With over 520 reviews and a 4.8-star average rating, the company is consistently rated among the highest-reviewed solar installers in Colorado. Namaste Solar offers a 25-year product warranty on panels, a 25-year inverter warranty, and a 10-year workmanship warranty on all installations.
Service Area
Namaste Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Namaste Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
520 reviews
Laura M.
Namaste Solar handled everything from the initial site assessment to final inspection. The crew was professional, respectful, and cleaned up after themselves. Our system has been producing above the original estimates for six months straight.
David R.
We chose Namaste because they are employee-owned and a B Corp. The whole process was smooth from start to finish. Our electricity bill went from $180/month to a $12 connection fee. Highly recommend.
Jennifer K.
Great quality installation and the monitoring system works well. The only minor issue was the permitting process took longer than expected, but that was more the city's fault than Namaste's. Very happy overall.
Frequently Asked Questions About Namaste Solar
What services does Namaste Solar offer?
Namaste Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Monitoring, Maintenance, Commercial Solar, Roof Assessment.
Is Namaste Solar NABCEP certified?
Yes, Namaste Solar is NABCEP certified and also holds B Corp Certified, SEIA Member certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Namaste Solar serve?
Namaste Solar serves Denver, Boulder, Aurora, Lakewood, Arvada, Westminster, Centennial, Longmont and 2 other areas. They are based in Denver with a service radius of 100 km.
What warranty does Namaste Solar offer?
Namaste Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Namaste Solar's customer reviews?
Namaste Solar has a 4.8/5 rating based on 520 customer reviews. Customers consistently rate them highly.
How long has Namaste Solar been in business?
Namaste Solar was founded in 2005 and has been in business for 21 years. They are one of the more experienced solar installers in their area.
Similar Installers in Denver
Get a Free Solar Quote from Namaste Solar
Fill in your details and we'll connect you with Namaste Solar.
Quote request sent!
Namaste Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile