OE

OHM Energy

Trusted Sussex renewable energy specialists with 15+ years experience in solar PV, battery storage, and heat pump installations

Brighton, UK
4.9 (573 reviews)
Verified
Residential Commercial

17+

Years in Business

573

Customer Reviews

100 km

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
98%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
0%
Online Presence
100%

About OHM Energy

OHM Energy is a renewable energy consultancy and installation company based at A2 Ropemakers Park, Hailsham, East Sussex, BN27 3GU. With over 15 years of experience, the company designs and delivers solar PV systems, battery storage solutions, and heat pump installations for residential and commercial customers across Sussex, Surrey, Kent, and Brighton. They hold MCS certification, are members of the Renewable Energy Consumer Code (RECC), and are registered with the government-backed TrustMark scheme.

The company has built one of the strongest review profiles of any solar installer in the South East, with a 5-star rating on Trustpilot from 573 customer reviews. OHM Energy’s approach combines technical consultancy with practical installation expertise, offering end-to-end services that include energy audits, system design, installation, commissioning, and ongoing monitoring and maintenance support. Their team includes specialists in solar PV, solar thermal, battery storage, and heat pump technology.

OHM Energy provides cost-effective renewable energy solutions based on detailed assessments of each property’s energy consumption, roof orientation, and shading conditions. The company serves a wide catchment area from their East Sussex base, covering Brighton, Hove, Eastbourne, Lewes, Worthing, Crawley, and Tunbridge Wells. Their long trading history and consistently high customer satisfaction scores reflect a focus on quality workmanship, transparent pricing, and reliable post-installation support.

Service Area

OHM Energy serves the following areas within a 100 km radius:

BrightonHoveEastbourneHailshamLewesWorthingCrawleyTunbridge Wells

Are you OHM Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring
Energy Audit

Certifications & Accreditations

MCS RECC TrustMark

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

573 reviews

Jonathan H

8 December 2025
Verified Customer

OHM Energy designed and installed a solar PV system with battery storage for us. The team were incredibly knowledgeable and professional, and the system has been performing brilliantly.

Victoria S

22 October 2025
Verified Customer

From the initial survey to the completed installation, OHM Energy were excellent. They provided honest advice about what system would suit our needs and the installation was completed on schedule.

Richard A

14 August 2025
Verified Customer

Highly professional team who clearly know their stuff. The solar panels and battery were installed efficiently with minimal disruption. Great communication throughout the whole process.

Frequently Asked Questions About OHM Energy

What services does OHM Energy offer?

OHM Energy offers Solar Installation, Battery Storage, Maintenance, Monitoring, Energy Audit.

Is OHM Energy MCS certified?

Yes, OHM Energy is MCS certified and also holds RECC, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does OHM Energy serve?

OHM Energy serves Brighton, Hove, Eastbourne, Hailsham, Lewes, Worthing, Crawley, Tunbridge Wells. They are based in Brighton with a service radius of 100 km.

What warranty does OHM Energy offer?

Contact OHM Energy directly for their current warranty terms.

How are OHM Energy's customer reviews?

OHM Energy has a 4.9/5 rating based on 573 customer reviews. Customers consistently rate them highly.

How long has OHM Energy been in business?

OHM Energy was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from OHM Energy

Fill in your details and we'll connect you with OHM Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote