OE

Optimum Electrics

MCS-certified solar and electrical specialists serving Cambridge and Cambridgeshire

Cambridge, UK
0 (0 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

50 km

Service Area

1-10

Employees

SurgePV Score

5.2 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Optimum Electrics

Optimum Electrics is an MCS-certified solar panel and electrical installation company serving Cambridge and the wider Cambridgeshire area. The company provides solar panel installation for homes and businesses, backed by experienced and qualified professionals who manage the entire process from initial survey through to post-installation support.

Optimum Electrics offers residential and commercial solar PV installations across Cambridge, Peterborough, Huntingdon, and Ely. The company’s consultative approach means system designs are tailored to each customer’s current and future energy needs, including EV ownership and battery storage planning.

Customer reviews highlight the company’s knowledgeable consultants, competitive pricing, and professional on-site teams. One reviewer noted that the company future-proofed their system design by accounting for a planned EV purchase, and described the installers as “very polite and professional.”

Services include solar PV installation, battery storage, EV charging points, and general electrical work across Cambridgeshire. The company can be reached by phone on 01733 601698.

Service Area

Optimum Electrics serves the following areas within a 50 km radius:

CambridgePeterboroughHuntingdonElyBury St Edmunds

Are you Optimum Electrics?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

0 reviews

Cambridge Homeowner

18 March 2024
Verified Customer

From initial enquiry and consultation to post-installation support — excellent throughout. The solar consultant was highly knowledgeable and took time to understand my needs, including future-proofing for an EV. Pricing was very competitive.

Frequently Asked Questions About Optimum Electrics

What services does Optimum Electrics offer?

Optimum Electrics offers Solar Installation, Battery Storage, EV Charging.

Is Optimum Electrics MCS certified?

Yes, Optimum Electrics is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Optimum Electrics serve?

Optimum Electrics serves Cambridge, Peterborough, Huntingdon, Ely, Bury St Edmunds. They are based in Cambridge with a service radius of 50 km.

What warranty does Optimum Electrics offer?

Optimum Electrics offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Optimum Electrics's customer reviews?

Optimum Electrics does not have any reviews yet. Be the first to leave a review after using their services.

How long has Optimum Electrics been in business?

Optimum Electrics was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Optimum Electrics

Fill in your details and we'll connect you with Optimum Electrics.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote