OS

Oxford Solar PV

Family-owned MCS installer specialising in SunPower panels and Tesla Powerwall in Wheatley, Oxfordshire

Oxford, UK
5 (2 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

2

Customer Reviews

40 km

Service Area

1-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Oxford Solar PV

Oxford Solar PV is a family-owned renewable energy company based at 50 High Street, Wheatley, Oxford, OX33 1XT. The business is the renewable energy subsidiary of Taylors Services, a long-established building services company operating across Oxfordshire. All installations are carried out by fully trained and qualified electricians and roofing operatives.

The company holds MCS, RECC, and NICEIC Domestic Installer accreditations, and is a Tesla Energy Certified Installer — one of a select group of UK installers authorised to install the Tesla Powerwall 3. For solar panels, Oxford Solar PV works with premium SunPower modules and SolarWatt glass-glass panels paired with SolarEdge inverters and optimisers.

Oxford Solar PV serves residential and commercial clients across Oxfordshire, specialising in bespoke system design for domestic rooftops and small commercial properties. The company offers the Tesla Powerwall as both a new-build option and a retrofit addition to existing solar systems.

Services include solar PV installation, Tesla Powerwall battery storage, system monitoring, and ongoing maintenance. The team covers Oxford, Wheatley, Thame, Abingdon, and Bicester.

Service Area

Oxford Solar PV serves the following areas within a 40 km radius:

OxfordWheatleyThameAbingdonBicester

Are you Oxford Solar PV?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS RECC NICEIC

Partner Manufacturers

Panels

SunPowerSolarWatt

Inverters

SolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Oxford Solar PV

What services does Oxford Solar PV offer?

Oxford Solar PV offers Solar Installation, Battery Storage, Maintenance.

Is Oxford Solar PV MCS certified?

Yes, Oxford Solar PV is MCS certified and also holds RECC, NICEIC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Oxford Solar PV serve?

Oxford Solar PV serves Oxford, Wheatley, Thame, Abingdon, Bicester. They are based in Oxford with a service radius of 40 km.

What warranty does Oxford Solar PV offer?

Oxford Solar PV offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Oxford Solar PV's customer reviews?

Oxford Solar PV has a 5/5 rating based on 2 customer reviews. Customers consistently rate them highly.

How long has Oxford Solar PV been in business?

Oxford Solar PV was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Oxford Solar PV

Fill in your details and we'll connect you with Oxford Solar PV.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote