PA Green Solar
Philadelphia-based solar installer specializing in building-integrated photovoltaic solutions
8+
Years in Business
18
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About PA Green Solar
PA Green Solar is a solar installation company headquartered at 1511 N Bodine Street in Philadelphia’s Olde Kensington neighborhood. The company specializes in building-integrated photovoltaic (BIPV) solutions that allow building owners to adopt solar energy without compromising architectural aesthetics, alongside traditional rooftop solar panel installations for residential and commercial customers.
The company provides full-service solar installations including site assessment, system design, permitting, installation, and utility interconnection. PA Green Solar installs panels from REC and Canadian Solar with Enphase and SolarEdge inverters and Enphase battery storage. The team has particular expertise with Philadelphia’s dense urban housing stock, including rowhomes and flat-roof commercial buildings.
PA Green Solar maintains a 4.7-star average rating across review platforms. Customers note the company’s understanding of Philadelphia-specific permitting requirements and its ability to design systems that work well on the city’s characteristic row-house rooftops. The company’s BIPV specialty sets it apart from conventional installers for customers who prioritize visual integration of solar panels with their building’s design.
Service Area
PA Green Solar serves the following areas within a 50-mile radius:
Contact Information
Are you PA Green Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
18 reviews
Carlos R.
PA Green Solar designed a system that looks great on our rowhome. They understand the unique challenges of Philadelphia homes and worked within our budget to maximize production. Very satisfied with the results.
Emily W.
The team at PA Green Solar was responsive and professional throughout the entire process. They handled all the city permits efficiently and the installation was completed on time. Our electric bill is now minimal.
Michael D.
Good quality installation and fair pricing. The crew was respectful of our property and cleaned up thoroughly. The only minor issue was scheduling, which took a couple extra weeks, but the end result was worth it.
Frequently Asked Questions About PA Green Solar
What services does PA Green Solar offer?
PA Green Solar offers Solar Installation, Solar Design, Battery Storage, bipv_installation.
Is PA Green Solar NABCEP certified?
Yes, PA Green Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does PA Green Solar serve?
PA Green Solar serves Philadelphia, Norristown, Camden, Bensalem, Chester. They are based in Philadelphia with a service radius of 80 km.
What warranty does PA Green Solar offer?
PA Green Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are PA Green Solar's customer reviews?
PA Green Solar has a 4.7/5 rating based on 18 customer reviews. Customers consistently rate them highly.
How long has PA Green Solar been in business?
PA Green Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Philadelphia
Get a Free Solar Quote from PA Green Solar
Fill in your details and we'll connect you with PA Green Solar.
Quote request sent!
PA Green Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile