PS

PES Solar

Family-owned solar installer serving Florida since 1997 with over one million panels installed

Orlando, Florida
4.7 (600 reviews)
Residential Commercial

29+

Years in Business

0

600

Customer Reviews

75 mi

Service Area

51-200

Employees

SurgePV Score

6.9 / 10
Customer Reviews
94%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About PES Solar

PES Solar is a family-owned and operated solar installation company headquartered at 685 South Ronald Reagan Boulevard in Longwood, Florida, serving the greater Orlando market. Founded in 1997, PES Solar is one of the longest-operating solar companies in the state, with over one million panels installed across Florida, Georgia, North Carolina, and South Carolina.

The company maintains an A+ BBB rating and a 4.7-star Google rating from approximately 600 reviews. PES Solar handles residential and commercial projects of all sizes, managing the full process from initial site evaluation and system design through engineering, permitting, installation, and utility interconnection.

PES Solar operates multiple locations across the Southeast United States but maintains its primary operations in the Orlando metro area. The company’s nearly three decades of experience in the Florida solar market gives it deep familiarity with local building codes, utility interconnection requirements, and weather conditions that affect system design and performance.

Service Area

PES Solar serves the following areas within a 75-mile radius:

OrlandoLongwoodWinter ParkKissimmeeDaytona BeachTampa

Are you PES Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
system_design

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

600 reviews

Verified Customer

28 August 2025
Verified Customer

PES Solar handled everything professionally from start to finish. The installation crew was efficient and the system has been performing as promised.

Verified Customer

15 June 2025
Verified Customer

Great experience with PES Solar. They explained all the options clearly and helped us choose the right system for our home.

Verified Customer

2 April 2025
Verified Customer

Solid installation and good communication throughout the process. The system was up and running within a few weeks of signing.

Frequently Asked Questions About PES Solar

What services does PES Solar offer?

PES Solar offers Solar Installation, Battery Storage, system_design.

Is PES Solar NABCEP certified?

PES Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does PES Solar serve?

PES Solar serves Orlando, Longwood, Winter Park, Kissimmee, Daytona Beach, Tampa. They are based in Orlando with a service radius of 120 km.

What warranty does PES Solar offer?

PES Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are PES Solar's customer reviews?

PES Solar has a 4.7/5 rating based on 600 customer reviews. Customers consistently rate them highly.

How long has PES Solar been in business?

PES Solar was founded in 1997 and has been in business for 29 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from PES Solar

Fill in your details and we'll connect you with PES Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote