PB

Photon Brothers

NABCEP-certified solar specialists serving Denver and the Front Range with premium panels and batteries

Denver, Colorado
4.6 (71 reviews)
Verified
Residential Commercial

13+

Years in Business

0

71

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.1 / 10
Customer Reviews
92%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
25%

About Photon Brothers

Photon Brothers is a solar installation company founded in 2013 by brothers David and Matt in Westminster, Colorado. The company serves the greater Denver metropolitan area and specializes in high-performance solar panel and home battery installations. Photon Brothers employs NABCEP-certified installers and master electricians who run conduit through the attic rather than along exterior walls, resulting in a cleaner and more visually appealing installation.

The company is a SunPower Elite dealer, installing SunPower and Maxeon solar panels alongside Enphase microinverters, SunPower SunVault batteries, and Tesla Powerwall systems. Photon Brothers offers flexible financing options including $0-down leases, solar loans, and power purchase agreements (PPAs), making solar accessible to a wider range of homeowners. Most residential installations are completed in a single day.

With a 4.6-star rating from 71 reviews on EnergySage, Photon Brothers has earned a reputation for quality craftsmanship and straightforward customer communication. The company provides 25-year manufacturer warranties on panels and inverters, plus a 10-year workmanship warranty on installation labor. Photon Brothers serves residential and commercial customers across the Denver metro area, including Westminster, Broomfield, Boulder, Arvada, and surrounding communities.

Service Area

Photon Brothers serves the following areas within a 50-mile radius:

DenverWestminsterBroomfieldBoulderArvadaThorntonLakewoodAuroraLittletonGolden

Are you Photon Brothers?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Monitoring
Energy Audit
Grid Connection

Certifications & Accreditations

NABCEP SunPower Elite

Partner Manufacturers

Panels

SunPowerMaxeon

Inverters

EnphaseSunPower

Batteries

SunPower SunVaultTesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

71 reviews

Brian H.

14 June 2025
Verified Customer

Photon Brothers installed a 10 kW SunPower system on our Westminster home. The crew ran all conduit through the attic so nothing is visible on the outside of the house. Installation took just one day and the system was producing within two weeks.

Sarah L.

28 February 2025
Verified Customer

David and the team were incredibly knowledgeable. They explained every option clearly without any pressure. The SunPower panels are producing more than projected and the monitoring app is easy to use.

Mike C.

5 October 2024
Verified Customer

Quality installation and good equipment. The SunPower panels come with a solid 25-year warranty. Would have liked a bit more communication during the permitting stage, but the end result is excellent.

Frequently Asked Questions About Photon Brothers

What services does Photon Brothers offer?

Photon Brothers offers Solar Installation, Battery Storage, Solar Design, Monitoring, Energy Audit, Grid Connection.

Is Photon Brothers NABCEP certified?

Yes, Photon Brothers is NABCEP certified and also holds SunPower Elite certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Photon Brothers serve?

Photon Brothers serves Denver, Westminster, Broomfield, Boulder, Arvada, Thornton, Lakewood, Aurora and 2 other areas. They are based in Denver with a service radius of 80 km.

What warranty does Photon Brothers offer?

Photon Brothers offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Photon Brothers's customer reviews?

Photon Brothers has a 4.6/5 rating based on 71 customer reviews. Customers consistently rate them highly.

How long has Photon Brothers been in business?

Photon Brothers was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Photon Brothers

Fill in your details and we'll connect you with Photon Brothers.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote