PT

Pro Terra Solar Technologies

BBB A+ rated solar installer in the Wichita metro serving residential and commercial clients

Wichita, Kansas
4.7 (30 reviews)
Verified
Residential Commercial

18+

Years in Business

0

30

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

8.5 / 10
Customer Reviews
94%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Pro Terra Solar Technologies

Pro Terra Solar Technologies is headquartered at 620 N Woodlawn Blvd, Derby, KS 67037, in the Wichita metropolitan area. Founded in 2008, the company has built a strong reputation as a leader in the commercial and residential solar energy industry across Kansas and Oklahoma.

Pro Terra Solar holds an A+ rating with the Better Business Bureau, where they have been accredited since January 2023. The company provides comprehensive solar installation services including system design, equipment procurement, installation, and ongoing support for both residential and commercial clients.

The company also operates Build Terra Roofing & Construction, offering integrated roofing and solar solutions. Pro Terra Solar serves Wichita, Derby, and surrounding communities throughout south-central Kansas, providing tailored solar energy solutions designed to maximize energy production and cost savings.

Service Area

Pro Terra Solar Technologies serves the following areas within a 75-mile radius:

WichitaDerbyAndoverHaysvilleMulvaneRose Hill

Are you Pro Terra Solar Technologies?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
system_design

Certifications & Accreditations

BBB A+

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

30 reviews

Verified Customer

18 September 2025
Verified Customer

Pro Terra Solar did an excellent job on our residential installation. From the initial consultation to the final inspection, the process was smooth and professional.

Verified Customer

25 June 2025
Verified Customer

We chose Pro Terra for our commercial rooftop project. Their experience showed in the design and execution. The system is producing above our expectations.

Verified Customer

14 March 2025
Verified Customer

Solid company with good BBB ratings. The installation was clean and the crew was respectful of our property. System is working well after several months.

Frequently Asked Questions About Pro Terra Solar Technologies

What services does Pro Terra Solar Technologies offer?

Pro Terra Solar Technologies offers Solar Installation, Battery Storage, system_design.

Is Pro Terra Solar Technologies NABCEP certified?

Pro Terra Solar Technologies holds the following certifications: BBB A+. Contact them directly for the latest accreditation details.

What areas does Pro Terra Solar Technologies serve?

Pro Terra Solar Technologies serves Wichita, Derby, Andover, Haysville, Mulvane, Rose Hill. They are based in Wichita with a service radius of 120 km.

What warranty does Pro Terra Solar Technologies offer?

Pro Terra Solar Technologies offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Pro Terra Solar Technologies's customer reviews?

Pro Terra Solar Technologies has a 4.7/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Pro Terra Solar Technologies been in business?

Pro Terra Solar Technologies was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Pro Terra Solar Technologies

Fill in your details and we'll connect you with Pro Terra Solar Technologies.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote