Project Solar
Transparent-pricing solar installer headquartered in Lehi, Utah, offering the lowest cost per watt in the market
8+
Years in Business
100
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About Project Solar
Project Solar is a solar installation company founded in 2018 and headquartered at 3401 N Thanksgiving Way Suite 200 in Lehi, Utah. The company has gained recognition for its transparent pricing model, which displays the cost per watt upfront with no hidden fees or high-pressure sales tactics. Project Solar serves residential customers across Utah and multiple other states.
The company uses an online platform that allows homeowners to design their solar system, see an instant price quote, and place an order without requiring an in-home sales visit. Project Solar handles all permitting, installation, and utility interconnection. Their customer support team is available via phone, email, and live chat during business hours from 8 AM to 5 PM Mountain Time.
Project Solar is BBB accredited and has generated a large volume of customer reviews. The company is known for offering some of the lowest cost-per-watt pricing in the Utah market while maintaining quality installation standards. Project Solar offers 25-year manufacturer warranties on panels and inverters plus a 10-year workmanship guarantee on all installations.
Service Area
Project Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Project Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.2
100 reviews
Jake T.
Project Solar has the most transparent pricing I found in Utah. No hidden fees, no pressure tactics. The online design tool let me see exactly what I was getting. Installation was fast and professional.
Megan S.
Good value for the price. Their online platform made the quoting process simple and I appreciated being able to see the cost breakdown upfront. The install went smoothly and the system is performing well.
Rick N.
Chose Project Solar for their pricing transparency. The process from order to install took about six weeks. Customer support was responsive via their chat system. System is generating as expected.
Frequently Asked Questions About Project Solar
What services does Project Solar offer?
Project Solar offers Solar Installation, Battery Storage, Solar Design.
Is Project Solar NABCEP certified?
Project Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Project Solar serve?
Project Solar serves Salt Lake City, Lehi, Provo, Ogden, Park City, Sandy, West Jordan, Draper. They are based in Salt Lake City with a service radius of 150 km.
What warranty does Project Solar offer?
Project Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Project Solar's customer reviews?
Project Solar has a 4.2/5 rating based on 100 customer reviews. They are well-regarded by their customers.
How long has Project Solar been in business?
Project Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Salt Lake City
Get a Free Solar Quote from Project Solar
Fill in your details and we'll connect you with Project Solar.
Quote request sent!
Project Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile