ProSolar Florida
Multinational solar installer with Orlando office, operating since 2007
19+
Years in Business
40
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About ProSolar Florida
ProSolar Florida is a full-service solar installation company with an office at 3601 Vineland Road, Suite 4 in Orlando, Florida. Founded in 2007, ProSolar operates as a multinational turn-key solar installer throughout the United States and the Caribbean. The Orlando location serves as the company’s hub for Central and Southeast Florida residential and commercial projects.
The company has been BBB-accredited since December 2021 and has been in business for over 17 years. ProSolar Florida offers roofing and solar solutions under one roof, handling system design, engineering, permitting, installation, and post-installation support. Customer reviews highlight the team’s professionalism and quality workmanship.
ProSolar Florida serves homeowners and businesses across Orange, Seminole, Osceola, Brevard, and Volusia counties. The company’s long operational history across multiple markets gives it experience with diverse building codes, roof types, and utility interconnection processes.
Service Area
ProSolar Florida serves the following areas within a 62-mile radius:
Contact Information
Are you ProSolar Florida?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.4
40 reviews
Verified Customer
ProSolar handled our installation with professionalism from start to finish. The crew was punctual, clean, and the system was connected quickly.
Verified Customer
Great experience working with ProSolar. They designed a system that fit our budget and energy needs perfectly.
Verified Customer
Good installation and fair pricing. The process took a bit longer than expected due to permitting, but the team kept us informed throughout.
Frequently Asked Questions About ProSolar Florida
What services does ProSolar Florida offer?
ProSolar Florida offers Solar Installation, Battery Storage, system_design.
Is ProSolar Florida NABCEP certified?
ProSolar Florida holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does ProSolar Florida serve?
ProSolar Florida serves Orlando, Kissimmee, Winter Park, Sanford, Daytona Beach. They are based in Orlando with a service radius of 100 km.
What warranty does ProSolar Florida offer?
ProSolar Florida offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are ProSolar Florida's customer reviews?
ProSolar Florida has a 4.4/5 rating based on 40 customer reviews. They are well-regarded by their customers.
How long has ProSolar Florida been in business?
ProSolar Florida was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Orlando
Get a Free Solar Quote from ProSolar Florida
Fill in your details and we'll connect you with ProSolar Florida.
Quote request sent!
ProSolar Florida will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile