Radiant Energy Solar
A+ BBB rated Orlando solar installer trusted by thousands of families since 2015
11+
Years in Business
100
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Radiant Energy Solar
Radiant Energy Solar is a solar installation company based at 100 East Pine Street, Suite 110 in Orlando, Florida. Trusted by thousands of Orlando families since 2015, the company has built a reputation as one of Central Florida’s top-rated solar providers, offering custom solar power solutions, system installations, and ongoing maintenance services.
The company holds an A+ BBB rating and is fully licensed and insured. Radiant Energy Solar has earned hundreds of five-star reviews from satisfied customers, with homeowners consistently citing the team’s professionalism, transparent pricing, and quality workmanship. The company assists clients with available financing options to reduce upfront costs.
Radiant Energy Solar serves residential customers throughout the greater Orlando area, designing systems tailored to each home’s energy consumption, roof orientation, and shading conditions. The company offers extended weekday and weekend hours, open 7 AM to 7 PM on weekdays and 8 AM to 6 PM on weekends, making it accessible for consultations and site visits outside traditional business hours.
Service Area
Radiant Energy Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Radiant Energy Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
100 reviews
Verified Customer
Radiant Energy Solar made the entire process seamless. From consultation to activation, their team was professional and communicative at every step.
Verified Customer
Excellent installation experience. The system is generating exactly as projected and our electricity bills have dropped significantly.
Verified Customer
Great local company with fair pricing and no-pressure sales. The installation crew was skilled and left our property spotless.
Frequently Asked Questions About Radiant Energy Solar
What services does Radiant Energy Solar offer?
Radiant Energy Solar offers Solar Installation, Battery Storage, Maintenance, system_design.
Is Radiant Energy Solar NABCEP certified?
Radiant Energy Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Radiant Energy Solar serve?
Radiant Energy Solar serves Orlando, Winter Park, Kissimmee, Sanford, Clermont. They are based in Orlando with a service radius of 80 km.
What warranty does Radiant Energy Solar offer?
Radiant Energy Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Radiant Energy Solar's customer reviews?
Radiant Energy Solar has a 4.9/5 rating based on 100 customer reviews. Customers consistently rate them highly.
How long has Radiant Energy Solar been in business?
Radiant Energy Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Orlando
Get a Free Solar Quote from Radiant Energy Solar
Fill in your details and we'll connect you with Radiant Energy Solar.
Quote request sent!
Radiant Energy Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile