Rawson Solar
MCS certified solar, EV charging, and battery storage installer serving Chester from a Wrexham base
2026+
Years in Business
30
Customer Reviews
60 km
Service Area
2-10
Employees
SurgePV Score
About Rawson Solar
Rawson Solar, trading as part of R-EV Power, is an MCS certified solar and renewable energy installer based at Unit 4, The Bridge Business Centre, Wrexham LL13 9UG, approximately 20 minutes from Chester. The company serves Chester, Liverpool, Manchester, Bangor, and surrounding areas of North Wales and the North West.
The company offers solar panel installations, battery storage systems, and EV charging solutions for domestic and commercial customers. Rawson Solar provides customers with a comprehensive handover pack containing all certifications and system documentation within two days of installation commissioning, a practical detail that sets them apart from installers who delay post-completion paperwork.
Rawson Solar holds a 5-star rating on Trustpilot, with reviewers consistently praising their professional service, clear communication throughout the project, and quality of workmanship. The company can be found online at r-evpower.co.uk, and Chester enquiries can be directed via the website or their Checkatrade profile under the name Rawson Evpower Limited.
Service Area
Rawson Solar serves the following areas within a 60 km radius:
Contact Information
Are you Rawson Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
30 reviews
Verified Customer
Professional service with clear communication throughout. We received a handover pack with all certifications and system information within 2 days of commissioning.
Verified Customer
Excellent quality workmanship and very responsive to any queries. Highly recommend Rawson Solar.
Frequently Asked Questions About Rawson Solar
What services does Rawson Solar offer?
Rawson Solar offers Solar Installation, Battery Storage, EV Charging.
Is Rawson Solar MCS certified?
Yes, Rawson Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Rawson Solar serve?
Rawson Solar serves Chester, Wrexham, Liverpool, Manchester, Bangor, North Wales. They are based in Chester with a service radius of 60 km.
What warranty does Rawson Solar offer?
Rawson Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Rawson Solar's customer reviews?
Rawson Solar has a 5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Rawson Solar been in business?
Rawson Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Chester
Get a Free Solar Quote from Rawson Solar
Fill in your details and we'll connect you with Rawson Solar.
Quote request sent!
Rawson Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile