RR

Redwood Renewables

MCS and TrustMark-certified solar panel installer serving Luton and Bedfordshire

Luton, UK
3.5 (6 reviews)
Verified
Residential

2026+

Years in Business

0

6

Customer Reviews

60 km

Service Area

2-10

Employees

SurgePV Score

7.3 / 10
Customer Reviews
70%
Certifications
90%
Experience
100%
Services Range
60%
Warranty Coverage
63%
Online Presence
25%

About Redwood Renewables

Redwood Renewables is a solar panel installation company with a service page dedicated to Luton, offering 2kW and larger solar panel installations for residential customers. The company is MCS-certified, TrustMark-accredited, HIES registered, IAA-accredited, and holds IWA Insurance Backed Guarantees, providing multiple layers of consumer protection on every installation.

The company is based in Essex (Braintree/Moulsham) and serves Luton and the wider Bedfordshire area as part of its national service coverage. As an MCS-certified installer, Redwood Renewables meets the quality standards required for customers to access the Smart Export Guarantee. Their engineers have helped hundreds of customers in Luton and beyond reduce their energy bills through solar PV systems.

Redwood Renewables holds a Trustpilot rating of 3.5 from 6 reviews. Some customers have praised the professional installation process and clear pre-installation communication, while others have reported experience with scheduling delays. Prospective customers are advised to confirm timelines and payment terms before proceeding.

Service Area

Redwood Renewables serves the following areas within a 60 km radius:

LutonBedfordshireHertfordshireEssex

Are you Redwood Renewables?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

MCS TrustMark HIES

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Redwood Renewables

What services does Redwood Renewables offer?

Redwood Renewables offers Solar Installation, Battery Storage.

Is Redwood Renewables MCS certified?

Yes, Redwood Renewables is MCS certified and also holds TrustMark, HIES certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Redwood Renewables serve?

Redwood Renewables serves Luton, Bedfordshire, Hertfordshire, Essex. They are based in Luton with a service radius of 60 km.

What warranty does Redwood Renewables offer?

Redwood Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Redwood Renewables's customer reviews?

Redwood Renewables has a 3.5/5 rating based on 6 customer reviews. See individual reviews on this page for more detail.

How long has Redwood Renewables been in business?

Redwood Renewables was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Redwood Renewables

Fill in your details and we'll connect you with Redwood Renewables.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote