RE

Resistance Electrical

NAPIT MCS-certified electrical and solar installation company based in Brighton with 10/10 Checkatrade rating

Brighton, UK
4.9 (254 reviews)
Verified
Residential

12+

Years in Business

254

Customer Reviews

30 km

Service Area

2-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
98%
Certifications
100%
Experience
85%
Services Range
90%
Warranty Coverage
0%
Online Presence
100%

About Resistance Electrical

Resistance Electrical is a Brighton-based electrical and solar installation company founded in 2014 by Tom, Edvin, and Ollie, who bring combined industry experience dating back to 2002. Located at 3 Medmerry Hill, Brighton BN2 4TP, the company serves residential customers across Brighton, Hove, and Portslade, specialising in solar PV installations, battery storage systems, and electric vehicle charger fitting alongside traditional electrical services.

The company holds NAPIT MCS certification (since February 2018), TrustMark registration, and Checkatrade membership. Their MCS accreditation means all solar installations qualify for the Smart Export Guarantee, and their TrustMark registration provides customers with access to government-backed consumer protection. Resistance Electrical has earned a 10.0 out of 10 rating on Checkatrade from 254 reviews and a 4.9-star Google rating from 100 reviews, making them one of the highest-rated electrical and solar companies in Brighton.

As a small, locally focused team, Resistance Electrical provides a hands-on service where customers deal directly with the people doing the work. Their services include solar panel installation, storage batteries, EV car chargers, full rewiring, consumer unit replacements, and testing and inspection. Customers frequently highlight their affordability, technical knowledge, and the quality of their communication throughout each project.

Service Area

Resistance Electrical serves the following areas within a 30 km radius:

BrightonHovePortsladeLewesShoreham-by-Sea

Are you Resistance Electrical?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

NAPIT MCS TrustMark Checkatrade

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

254 reviews

Tom R

1 December 2025
Verified Customer

Resistance Electrical were thoroughly professional and efficient installing our solar panel system. The team were polite and worked quickly, and the whole installation was completed in a day.

Emma C

12 October 2025
Verified Customer

Really affordable solar company and very knowledgeable on their product. They explained all the options clearly and the installation quality was excellent. Highly recommend.

Daniel W

5 August 2025
Verified Customer

Fantastic service from start to finish. The team installed solar panels and a battery storage system. Communication was great throughout and the workmanship was top quality.

Frequently Asked Questions About Resistance Electrical

What services does Resistance Electrical offer?

Resistance Electrical offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Resistance Electrical MCS certified?

Yes, Resistance Electrical is MCS certified and also holds NAPIT, TrustMark, Checkatrade certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Resistance Electrical serve?

Resistance Electrical serves Brighton, Hove, Portslade, Lewes, Shoreham-by-Sea. They are based in Brighton with a service radius of 30 km.

What warranty does Resistance Electrical offer?

Contact Resistance Electrical directly for their current warranty terms.

How are Resistance Electrical's customer reviews?

Resistance Electrical has a 4.9/5 rating based on 254 customer reviews. Customers consistently rate them highly.

How long has Resistance Electrical been in business?

Resistance Electrical was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Resistance Electrical

Fill in your details and we'll connect you with Resistance Electrical.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote