Revolution Solar
DC-based solar installer with the most completed projects in the District of Columbia
11+
Years in Business
20
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Revolution Solar
Revolution Solar is a Washington DC-based solar installation company operating from 641 S Street NW in the District. The company has completed more solar projects in DC than any other installer, building a deep understanding of the District’s permitting processes, utility requirements, and local incentive programs.
Revolution Solar provides residential and commercial solar panel installations across Washington DC and the surrounding Maryland suburbs. The company handles system design, engineering, permitting, installation, and utility interconnection, guiding customers through the DC SREC program and federal tax credit applications.
The company maintains BBB accreditation and holds proper DC solar contractor licensing. Revolution Solar offers custom quotations based on each property’s solar potential and energy usage patterns.
Service Area
Revolution Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Revolution Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
20 reviews
Andre J.
Revolution Solar completed our installation quickly and professionally. They know the DC permitting system inside and out, which made the process much smoother than expected.
Keisha W.
We chose Revolution because they've done more projects in DC than anyone else. The installation was clean and efficient, and our electricity bills have dropped significantly.
Paul G.
Good experience overall. The team was knowledgeable about DC solar incentives and helped us maximize our SREC income. System has been reliable since installation.
Frequently Asked Questions About Revolution Solar
What services does Revolution Solar offer?
Revolution Solar offers Solar Installation, Solar Design, Grid Connection.
Is Revolution Solar NABCEP certified?
Revolution Solar holds the following certifications: BBB Accredited, DC Licensed Solar Contractor. Contact them directly for the latest accreditation details.
What areas does Revolution Solar serve?
Revolution Solar serves Washington, Takoma Park, Hyattsville, College Park, Cheverly. They are based in Washington with a service radius of 80 km.
What warranty does Revolution Solar offer?
Revolution Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Revolution Solar's customer reviews?
Revolution Solar has a 4.6/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Revolution Solar been in business?
Revolution Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Washington
Get a Free Solar Quote from Revolution Solar
Fill in your details and we'll connect you with Revolution Solar.
Quote request sent!
Revolution Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile