R&B Mechanical & Electrical
MCS, RECC, and NICEIC registered solar installers covering Leeds and the wider North
11+
Years in Business
28
Customer Reviews
80 km
Service Area
11-50
Employees
SurgePV Score
About R&B Mechanical & Electrical
R&B Mechanical & Electrical Ltd is a multi-disciplinary engineering company based in Keighley, West Yorkshire. Founded in 2015, the company holds MCS, RECC, and NICEIC registrations for solar panel installation and maintenance. Their design and solar panel installation engineers have over a decade of experience installing solar PV systems for a wide range of customers across the UK, from domestic rooftop arrays to large commercial and agricultural projects.
The company can design, install, and maintain solar systems ranging from small 4 kWp residential setups to commercial installations exceeding 1,000 kWp. R&B M&E provides detailed payback calculations for every project, helping customers understand their return on investment before committing. Their services extend beyond solar to include general mechanical and electrical contracting, HVAC systems, and Gas Safe registered heating engineering.
R&B M&E serves customers across West Yorkshire and the wider North of England, covering Leeds, Bradford, Harrogate, Skipton, Ilkley, and beyond. The company is located at Devonshire Works on Pitt Street in Keighley, approximately 20 miles from Leeds and 40 miles from Manchester, making them well-positioned to serve a broad geographic area.
Service Area
R&B Mechanical & Electrical serves the following areas within a 80 km radius:
Contact Information
Are you R&B Mechanical & Electrical?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.7
28 reviews
Andrew Pearson
R&B M&E designed and installed a commercial solar system for our warehouse. Professional team, delivered on time and on budget. The system is performing above projections.
Michelle Hartley
Excellent service for our home solar installation. The team were knowledgeable, tidy, and handled all the paperwork. Very pleased with the results.
Frequently Asked Questions About R&B Mechanical & Electrical
What services does R&B Mechanical & Electrical offer?
R&B Mechanical & Electrical offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is R&B Mechanical & Electrical MCS certified?
Yes, R&B Mechanical & Electrical is MCS certified and also holds RECC, NICEIC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does R&B Mechanical & Electrical serve?
R&B Mechanical & Electrical serves Leeds, Keighley, Bradford, Skipton, Harrogate, Ilkley. They are based in Leeds with a service radius of 80 km.
What warranty does R&B Mechanical & Electrical offer?
R&B Mechanical & Electrical offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.
How are R&B Mechanical & Electrical's customer reviews?
R&B Mechanical & Electrical has a 4.7/5 rating based on 28 customer reviews. Customers consistently rate them highly.
How long has R&B Mechanical & Electrical been in business?
R&B Mechanical & Electrical was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Leeds
Get a Free Solar Quote from R&B Mechanical & Electrical
Fill in your details and we'll connect you with R&B Mechanical & Electrical.
Quote request sent!
R&B Mechanical & Electrical will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile