SR

Scallan Renewables

Dundee renewables engineer installing solar, heat pumps, and biomass systems since 2006

Dundee, UK
0 (13 reviews)
Verified
Residential

20+

Years in Business

0

13

Customer Reviews

50 km

Service Area

1-10

Employees

SurgePV Score

5.7 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Scallan Renewables

Scallan Renewables is located at 17a Janefield Place, Dundee, DD4 7AD, and has been designing and installing renewable energy systems since 2006. The company is an arm of E Scallan Ltd, which has roots in domestic plumbing, heating, and gas — providing technical depth across the full range of building services relevant to residential solar and heat pump projects.

The company installs solar thermal and solar PV systems, biomass boilers, air and ground source heat pumps, and handles domestic heating system design and maintenance. This multi-technology capability means Scallan Renewables can advise customers on the most appropriate combination of technologies for their specific home, climate zone, and energy consumption profile rather than defaulting to a single product type.

Confirmed supplier partnerships include Canadian Solar for panels and SolarEdge and Danfoss for inverter systems. The company is listed on the Dundee Trusted Trader Scheme, which requires businesses to meet local council trading standards, and has received 100% recommendation from 13 verified Facebook reviews. Scallan Renewables focuses primarily on residential customers across Dundee, Angus, and Perthshire.

Service Area

Scallan Renewables serves the following areas within a 50 km radius:

DundeeAngusPerthForfar

Are you Scallan Renewables?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Panels

Canadian Solar

Inverters

SolarEdgeDanfoss

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

13 reviews

Verified Customer

8 May 2024
Verified Customer

Great experience from start to finish. Scallan Renewables installed our solar system efficiently and everything has been working perfectly.

Frequently Asked Questions About Scallan Renewables

What services does Scallan Renewables offer?

Scallan Renewables offers Solar Installation, Battery Storage, Maintenance.

Is Scallan Renewables MCS certified?

Yes, Scallan Renewables is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Scallan Renewables serve?

Scallan Renewables serves Dundee, Angus, Perth, Forfar. They are based in Dundee with a service radius of 50 km.

What warranty does Scallan Renewables offer?

Scallan Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Scallan Renewables's customer reviews?

Scallan Renewables has a 0/5 rating based on 13 customer reviews. See individual reviews on this page for more detail.

How long has Scallan Renewables been in business?

Scallan Renewables was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Scallan Renewables

Fill in your details and we'll connect you with Scallan Renewables.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote