Send It Solar
Portsmouth-based MCS certified solar installers with 4.8-star Trustpilot rating, run by qualified electricians
5+
Years in Business
21
Customer Reviews
80 km
Service Area
2-10
Employees
SurgePV Score
About Send It Solar
Send It Solar is a Portsmouth-based solar panel installation company located at 8a Queens Road, PO2 7LZ. The company was started by two qualified electricians with a combined 20 years of experience and a shared passion for renewable energy. Because they are electricians by trade and also carry out roof work themselves, they bring complete end-to-end expertise to every solar PV system installation.
Send It Solar delivers solar panel installations across Hampshire, West Sussex, and Surrey for both domestic and commercial properties. The company holds MCS, TrustMark, and NAPIT accreditations, giving customers confidence that installations meet recognised industry standards. They handle every stage of the process from initial survey through to commissioning.
With a 4.8-star rating on Trustpilot from 21 reviews, Send It Solar has built a strong local reputation. Customers consistently praise the team’s professionalism, clear communication, and quality workmanship. The company offers free initial surveys and competitive pricing on solar PV systems, battery storage, and EV charger installations.
Service Area
Send It Solar serves the following areas within a 80 km radius:
Contact Information
Are you Send It Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
21 reviews
Verified Customer
Brilliant from start to finish. Professional, tidy, and the system is performing above expectations. Would recommend to anyone.
Verified Customer
Great communication throughout and the installation was completed on time. Really happy with the quality of the workmanship.
Verified Customer
Two very knowledgeable and friendly installers who clearly take pride in their work. Everything was explained and left spotless.
Frequently Asked Questions About Send It Solar
What services does Send It Solar offer?
Send It Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Send It Solar MCS certified?
Yes, Send It Solar is MCS certified and also holds TrustMark, NAPIT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Send It Solar serve?
Send It Solar serves Portsmouth, Hampshire, Surrey, West Sussex, Chichester, Guildford. They are based in Portsmouth with a service radius of 80 km.
What warranty does Send It Solar offer?
Contact Send It Solar directly for their current warranty terms.
How are Send It Solar's customer reviews?
Send It Solar has a 4.8/5 rating based on 21 customer reviews. Customers consistently rate them highly.
How long has Send It Solar been in business?
Send It Solar was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Portsmouth
Get a Free Solar Quote from Send It Solar
Fill in your details and we'll connect you with Send It Solar.
Quote request sent!
Send It Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile