Shockoe Solar
Local Ashland-based solar contractor serving Richmond with residential and commercial installations and personalized system design
8+
Years in Business
20
Customer Reviews
62 mi
Service Area
2-10
Employees
SurgePV Score
About Shockoe Solar
Shockoe Solar is a local solar contractor based at 13421 River Ridge Lane in Ashland, Virginia, serving the greater Richmond area for both residential and commercial solar installations. Led by president Bernie Stanley, the company holds contractor licenses in Virginia and North Carolina and provides personalized solar system design, installation, and maintenance services. Shockoe Solar takes a hands-on approach to each project, conducting detailed site assessments to determine optimal panel placement based on roof orientation, shading, and energy usage patterns.
The company handles residential rooftop systems as well as small to mid-size commercial installations. Shockoe Solar installs Enphase microinverter systems and works with multiple panel manufacturers to match the right equipment to each project’s budget and performance requirements. The company manages the full permitting and utility interconnection process for customers.
Shockoe Solar maintains a 4.8-star average rating with customers praising the company’s personal attention, responsive communication, and quality of installation work. As a smaller local operator, the company offers the advantage of direct access to the project lead throughout the entire process, from initial consultation through system activation and ongoing support.
Service Area
Shockoe Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Shockoe Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
20 reviews
Brian K.
Shockoe Solar was responsive from the first call. Bernie walked us through the design options and explained the expected output for each configuration. Installation was clean and completed in one day for our residential system.
Laura G.
Small local company that delivers quality work. They took the time to assess our roof and recommended the optimal panel placement. System has been running without any issues since installation.
Steve D.
Good experience overall with our commercial installation. The permitting process took a bit longer than expected but Shockoe kept us updated. System is performing well and the price was competitive.
Frequently Asked Questions About Shockoe Solar
What services does Shockoe Solar offer?
Shockoe Solar offers Solar Installation, Solar Design, Maintenance, Grid Connection.
Is Shockoe Solar NABCEP certified?
Shockoe Solar holds the following certifications: Licensed Contractor (VA), Licensed Contractor (NC). Contact them directly for the latest accreditation details.
What areas does Shockoe Solar serve?
Shockoe Solar serves Richmond, Ashland, Glen Allen, Henrico, Mechanicsville, Chesterfield. They are based in Richmond with a service radius of 100 km.
What warranty does Shockoe Solar offer?
Shockoe Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Shockoe Solar's customer reviews?
Shockoe Solar has a 4.8/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Shockoe Solar been in business?
Shockoe Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Richmond
Get a Free Solar Quote from Shockoe Solar
Fill in your details and we'll connect you with Shockoe Solar.
Quote request sent!
Shockoe Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile