SR

Simcott Renewables

MCS, NAPIT and Octopus Energy trusted partner for solar PV and battery storage across Basildon and Essex

Basildon, UK
5 (13 reviews)
Verified
Residential Commercial

4+

Years in Business

0

13

Customer Reviews

50 km

Service Area

1-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
100%
Certifications
90%
Experience
70%
Services Range
75%
Warranty Coverage
63%
Online Presence
100%

About Simcott Renewables

Simcott Renewables Limited is a solar PV and battery storage specialist registered at 26 Atlantic Square, Station Road, Witham, Essex CM8 2TL. The company was incorporated in October 2022 and serves residential and commercial customers across Basildon and the wider Essex area from their Witham base.

Simcott Renewables holds MCS certification, NAPIT accreditation, and CHAS approval — a combination of industry certifications that demonstrates both technical competence and health and safety compliance. The company is also an Octopus Energy Trusted Partner, meaning they have been vetted and approved by Octopus Energy against their quality and service standards, an increasingly valued credential for homeowners looking to participate in Octopus energy tariffs.

The company provides domestic solar PV installation and battery storage services for customers in Basildon, Witham, Chelmsford, Braintree, and Brentwood. Simcott Renewables can be contacted by calling 07546 716226 or by email at [email protected]. Their Octopus Energy partnership makes them a useful contact point for homeowners considering solar alongside smart energy tariffs and time-of-use optimisation.

Service Area

Simcott Renewables serves the following areas within a 50 km radius:

BasildonWithamChelmsfordBraintreeBrentwoodColchester

Are you Simcott Renewables?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS NAPIT CHAS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Simcott Renewables

What services does Simcott Renewables offer?

Simcott Renewables offers Solar Installation, Battery Storage, Maintenance.

Is Simcott Renewables MCS certified?

Yes, Simcott Renewables is MCS certified and also holds NAPIT, CHAS certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Simcott Renewables serve?

Simcott Renewables serves Basildon, Witham, Chelmsford, Braintree, Brentwood, Colchester. They are based in Basildon with a service radius of 50 km.

What warranty does Simcott Renewables offer?

Simcott Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Simcott Renewables's customer reviews?

Simcott Renewables has a 5/5 rating based on 13 customer reviews. Customers consistently rate them highly.

How long has Simcott Renewables been in business?

Simcott Renewables was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Simcott Renewables

Fill in your details and we'll connect you with Simcott Renewables.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote