Simple Solar
Arizona's trusted local solar installer with NABCEP-certified teams and a 25-year production guarantee
4+
Years in Business
43
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Simple Solar
Simple Solar is a locally owned and operated Arizona solar company established in 2022 that has quickly earned an Elite Installer rating on EnergySage and a perfect 5.0-star rating from customers. Despite being newer to the market, the company’s NABCEP-certified installation teams bring years of industry experience, and their roster of manufacturer certifications, including Q Cells Q.Partner, REC ProTrust, Canadian Solar, Enphase, and Tigo, reflects a commitment to working with top-tier equipment.
The company provides residential and commercial solar installation, battery storage, Level 2 EV charger installation, array expansion, and re-roofing services. Simple Solar works with panels from Q Cells, REC, and Canadian Solar, paired with Enphase microinverters and Tigo optimizers. Battery storage options include Tesla Powerwall and Enphase IQ Battery for homeowners looking to add backup power or maximize self-consumption.
What sets Simple Solar apart is their 25-year production guarantee: if the system generates less energy than forecast in any given year, the company pays the customer for the shortfall. Every system is proactively monitored and maintained for 25 years as part of this commitment. Customers praise the company’s transparent communication, on-time installations, and willingness to educate homeowners throughout the process.
Service Area
Simple Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Simple Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
43 reviews
Ryan K.
Simple Solar was communicative, punctual, and professional at every step. They explained the entire process clearly and hit every milestone on schedule. Our system is producing above the guaranteed amount.
Samantha J.
We compared several quotes and Simple Solar offered the best combination of quality equipment and fair pricing. The NABCEP-certified crew installed our system in a single day. Monitoring setup was seamless.
Greg M.
Outstanding service from a local company that clearly cares about doing things right. They helped us add an EV charger alongside our solar panels. The 25-year production guarantee gives us real confidence.
Frequently Asked Questions About Simple Solar
What services does Simple Solar offer?
Simple Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Roof Assessment.
Is Simple Solar NABCEP certified?
Yes, Simple Solar is NABCEP certified and also holds BBB Accredited, Q Cells Q.Partner, REC Certified ProTrust Installer, Canadian Solar Certified Installer, Enphase Certified Installer, Tigo Certified Installer certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Simple Solar serve?
Simple Solar serves Phoenix, Tempe, Mesa, Chandler, Gilbert, Scottsdale, Glendale, Peoria. They are based in Phoenix with a service radius of 80 km.
What warranty does Simple Solar offer?
Simple Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Simple Solar's customer reviews?
Simple Solar has a 5/5 rating based on 43 customer reviews. Customers consistently rate them highly.
How long has Simple Solar been in business?
Simple Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.
Similar Installers in Phoenix
Get a Free Solar Quote from Simple Solar
Fill in your details and we'll connect you with Simple Solar.
Quote request sent!
Simple Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile