SG

Smart Green Solar

Rhode Island's top-voted solar company with over 200 local employees and union electrician installations

Providence, Rhode Island
4.8 (200 reviews)
Verified
Residential Commercial

10+

Years in Business

3,000+

Projects Completed

200

Customer Reviews

50 mi

Service Area

201-500

Employees

SurgePV Score

8.9 / 10
Customer Reviews
96%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Smart Green Solar

Smart Green Solar is a full-service solar installation company headquartered at 33 Broad Street in Providence, Rhode Island. Voted Rhode Island’s number one solar energy company, Smart Green employs over 200 people who live in Rhode Island and Massachusetts, and exclusively uses local union electricians for all installations. The company serves both residential and commercial customers across Rhode Island, Massachusetts, and Connecticut.

Smart Green Solar follows a thorough installation process that includes site surveys, CAD-based system design, permitting, utility approval, installation, and system activation. The company works with Qcells and REC panels, Enphase and SolarEdge inverters, and offers Tesla Powerwall and Enphase IQ Battery storage systems. Their team is NABCEP-certified and EVITP-certified for EV charger installations.

The company has built its reputation on local hiring and community involvement. Smart Green Solar helps homeowners navigate Rhode Island’s Renewable Energy Growth Program and net metering policies, and offers multiple financing options including $0-down solar loans. Their Providence office is open Monday through Friday for consultations and customer support.

Service Area

Smart Green Solar serves the following areas within a 50-mile radius:

ProvidenceCranstonWarwickPawtucketEast ProvidenceWoonsocketJohnstonNorth Providence

Are you Smart Green Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Maintenance
Monitoring
Grid Connection
Commercial Solar

Certifications & Accreditations

NABCEP EVITP Certified

Partner Manufacturers

Panels

QcellsREC

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

200 reviews

Joseph D.

22 October 2025
Verified Customer

Smart Green Solar was the clear choice after comparing several companies. They use union electricians, which gave us confidence in the quality. The installation was clean, fast, and our system has been exceeding production estimates.

Linda M.

14 July 2025
Verified Customer

From the first phone call to the day they turned on our system, Smart Green was professional and transparent. They explained all the Rhode Island incentives and helped us maximize our savings.

Eric R.

1 April 2025
Verified Customer

Good experience overall. The system is performing well and the installation quality is excellent. Scheduling took a bit longer than expected during peak season, but the wait was worth it.

Frequently Asked Questions About Smart Green Solar

What services does Smart Green Solar offer?

Smart Green Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Maintenance, Monitoring, Grid Connection, Commercial Solar.

Is Smart Green Solar NABCEP certified?

Yes, Smart Green Solar is NABCEP certified and also holds EVITP Certified certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Smart Green Solar serve?

Smart Green Solar serves Providence, Cranston, Warwick, Pawtucket, East Providence, Woonsocket, Johnston, North Providence. They are based in Providence with a service radius of 80 km.

What warranty does Smart Green Solar offer?

Smart Green Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Smart Green Solar's customer reviews?

Smart Green Solar has a 4.8/5 rating based on 200 customer reviews. Customers consistently rate them highly.

How long has Smart Green Solar been in business?

Smart Green Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Smart Green Solar

Fill in your details and we'll connect you with Smart Green Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote