Smart Wave Solar
NABCEP-certified residential and commercial solar installer serving Utah's Wasatch Front since 2015
11+
Years in Business
70
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Smart Wave Solar
Smart Wave Solar is a solar installation company founded in 2015 and based at 14553 S 790 W Suite C in Bluffdale, Utah. The company serves residential and commercial customers across the Salt Lake City metro area, including 36 cities in Utah. Smart Wave Solar is NABCEP-certified and BBB accredited.
The company specializes in custom solar panel system design and installation, paired with battery storage solutions including Tesla Powerwall. Smart Wave Solar handles every step of the process from initial consultation and system design through permitting, installation, and utility interconnection. Their no-pressure sales approach and transparent pricing have earned consistent positive reviews from customers.
Smart Wave Solar offers a 25-year equipment warranty and a 25-year workmanship warranty, among the longest in the Utah market. The company maintains positive ratings across review platforms and is known for responsive customer service and professional installation crews.
Service Area
Smart Wave Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Smart Wave Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
70 reviews
Tyler B.
Smart Wave Solar installed our system quickly and professionally. The sales process was low-pressure and informative. Our electricity bill has dropped significantly since the panels went active.
Amanda L.
Great local company. They walked us through the entire process and helped us understand our energy usage. The Tesla Powerwall battery was a smart addition. Very happy with the result.
Nathan P.
Good installation and decent pricing. The system is performing well. Only minor issue was the timeline slipping by about two weeks, but communication was solid throughout the process.
Frequently Asked Questions About Smart Wave Solar
What services does Smart Wave Solar offer?
Smart Wave Solar offers Solar Installation, Battery Storage, Maintenance, Solar Design.
Is Smart Wave Solar NABCEP certified?
Yes, Smart Wave Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Smart Wave Solar serve?
Smart Wave Solar serves Salt Lake City, Bluffdale, Sandy, Draper, West Jordan, South Jordan, Provo, Orem. They are based in Salt Lake City with a service radius of 100 km.
What warranty does Smart Wave Solar offer?
Smart Wave Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Smart Wave Solar's customer reviews?
Smart Wave Solar has a 4.5/5 rating based on 70 customer reviews. Customers consistently rate them highly.
How long has Smart Wave Solar been in business?
Smart Wave Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Salt Lake City
Get a Free Solar Quote from Smart Wave Solar
Fill in your details and we'll connect you with Smart Wave Solar.
Quote request sent!
Smart Wave Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile