SP

Sol Power Solar

Providence-based full-service solar installer delivering quality residential and commercial systems since 2013

Providence, Rhode Island
4.7 (45 reviews)
Verified
Residential Commercial

13+

Years in Business

600+

Projects Completed

45

Customer Reviews

37 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
94%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Sol Power Solar

Sol Power Solar is a full-service solar installation company based at 11 Almy Street in Providence, Rhode Island. Operating since 2013, the company has built a strong reputation for quality workmanship and reliable customer service across the state. Sol Power serves both residential and commercial customers throughout Rhode Island, from Providence and Cranston to the South County coastal communities.

The company installs panels from Qcells and Silfab alongside Enphase microinverter technology, and offers battery storage through Tesla Powerwall and Enphase IQ Battery systems. Sol Power’s NABCEP-certified team handles every phase of the solar installation process, including site evaluation, system design, permitting, installation, and utility interconnection. The company is BBB accredited and maintains a warehouse facility in Charlestown for equipment storage.

Sol Power Solar helps homeowners take advantage of Rhode Island’s Renewable Energy Growth Program, net metering, and other available incentives. The company offers free consultations and provides detailed production and savings estimates before customers commit. Their Providence-based team is available Monday through Saturday to answer questions and provide ongoing support.

Service Area

Sol Power Solar serves the following areas within a 37-mile radius:

ProvidenceCranstonWarwickEast ProvidencePawtucketNorth KingstownSouth KingstownCharlestown

Are you Sol Power Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Maintenance
Grid Connection

Certifications & Accreditations

NABCEP BBB Accredited

Partner Manufacturers

Panels

QcellsSilfab

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

45 reviews

Colleen F.

5 October 2025
Verified Customer

Sol Power did a fantastic job on our installation. They are truly local and it shows in the care they take. The crew was knowledgeable, respectful of our property, and finished ahead of schedule.

Matt B.

28 June 2025
Verified Customer

We went with Sol Power because they are based right here in Providence. The whole process was smooth and they helped us understand all the Rhode Island incentive programs. System is performing great.

Teresa G.

10 March 2025
Verified Customer

Good company with solid workmanship. The installation quality is excellent and the system looks great on our roof. Customer service has been responsive for follow-up questions.

Frequently Asked Questions About Sol Power Solar

What services does Sol Power Solar offer?

Sol Power Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Maintenance, Grid Connection.

Is Sol Power Solar NABCEP certified?

Yes, Sol Power Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Sol Power Solar serve?

Sol Power Solar serves Providence, Cranston, Warwick, East Providence, Pawtucket, North Kingstown, South Kingstown, Charlestown. They are based in Providence with a service radius of 60 km.

What warranty does Sol Power Solar offer?

Sol Power Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sol Power Solar's customer reviews?

Sol Power Solar has a 4.7/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has Sol Power Solar been in business?

Sol Power Solar was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Sol Power Solar

Fill in your details and we'll connect you with Sol Power Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote