SD

Solar Dynamics

Miami solar and roofing company with over 1,000 installations since 2020

Miami, Florida
4.9 (40 reviews)
Verified
Residential Commercial

6+

Years in Business

1,000+

Projects Completed

40

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8 / 10
Customer Reviews
98%
Certifications
90%
Experience
70%
Services Range
100%
Warranty Coverage
63%
Online Presence
25%

About Solar Dynamics

Solar Dynamics is a Miami-based solar and roofing company founded in 2020 and operating from the Doral area. Since launch, the company has completed over 1,000 residential and commercial solar installations across Miami-Dade County and surrounding areas. Their dual expertise in roofing and solar allows them to handle combined roof replacement and solar installation projects as a single scope of work, which can reduce costs and streamline timelines for homeowners.

The company holds both a Florida state-certified solar contractor license and a roofing contractor license, along with a BBB business profile. Solar Dynamics offers full-service solar installations including site assessment, system design, permitting, installation, and ongoing maintenance. Their consultation process includes a thorough electrical evaluation, and customers report that the team addresses pre-existing electrical issues that other contractors overlook.

Solar Dynamics has earned a 4.9-star rating on EcoWatch and maintains positive reviews on the BBB platform. The company has been recognized on multiple best-of lists for Miami solar installers. Customers consistently note the company’s superior technical knowledge, competitive pricing, and ability to solve complex installation challenges. Their roofing background is particularly valued by homeowners who need roof work before or alongside their solar installation.

Service Area

Solar Dynamics serves the following areas within a 50-mile radius:

MiamiDoralHialeahMiami BeachCoral GablesKendallHomesteadFort Lauderdale

Are you Solar Dynamics?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Solar Design
Roof Assessment
Energy Audit
Grid Connection

Certifications & Accreditations

BBB Accredited State Certified Solar Contractor State Certified Roofing Contractor

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

40 reviews

Eduardo P.

10 September 2025
Verified Customer

Solar Dynamics handled both my roof replacement and solar installation as a single project. This saved me time and money compared to hiring two separate contractors. The crew was knowledgeable and efficient.

Christine L.

2 June 2025
Verified Customer

Out of five different companies I had over at my house, Solar Dynamics was the best. By far more knowledgeable and they solved electrical issues that other contractors did not even want to address.

Anthony G.

18 February 2025
Verified Customer

Great experience from consultation to final inspection. They were upfront about costs and timelines. The system has been running flawlessly for four months now.

Frequently Asked Questions About Solar Dynamics

What services does Solar Dynamics offer?

Solar Dynamics offers Solar Installation, Battery Storage, Maintenance, Solar Design, Roof Assessment, Energy Audit, Grid Connection.

Is Solar Dynamics NABCEP certified?

Solar Dynamics holds the following certifications: BBB Accredited, State Certified Solar Contractor, State Certified Roofing Contractor. Contact them directly for the latest accreditation details.

What areas does Solar Dynamics serve?

Solar Dynamics serves Miami, Doral, Hialeah, Miami Beach, Coral Gables, Kendall, Homestead, Fort Lauderdale. They are based in Miami with a service radius of 80 km.

What warranty does Solar Dynamics offer?

Solar Dynamics offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Dynamics's customer reviews?

Solar Dynamics has a 4.9/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Solar Dynamics been in business?

Solar Dynamics was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Solar Dynamics

Fill in your details and we'll connect you with Solar Dynamics.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote