Solar.IQ
NABCEP-certified solar installer offering residential and commercial solutions across Utah since 2018
8+
Years in Business
24
Customer Reviews
75 mi
Service Area
2-10
Employees
SurgePV Score
About Solar.IQ
Solar.IQ is a solar installation company founded in 2018 and based at 257 River Bend Way Suite 105 in North Salt Lake, Utah. The company serves residential and commercial customers across Utah, Arizona, Idaho, Nevada, and Wyoming. Solar.IQ is a NABCEP-certified installer that handles all aspects of solar projects from initial consultation through design, installation, and utility interconnection.
The company offers customized solar panel systems designed to match each property’s energy usage and roof configuration. Solar.IQ provides battery storage options alongside standard solar installations and operates Monday through Saturday from 8 AM to 8 PM, offering extended hours for customer convenience.
Solar.IQ holds a 4.0-star rating from 24 reviews across platforms. The company offers 25-year manufacturer warranties on panels and inverters plus a 10-year workmanship warranty on all installations. Customers can request a free solar evaluation through the company’s website or by calling the office directly.
Service Area
Solar.IQ serves the following areas within a 75-mile radius:
Contact Information
Are you Solar.IQ?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4
24 reviews
Paul H.
Solar.IQ designed and installed a system perfectly sized for our home. The NABCEP-certified team was professional and completed the job in one day. Our utility bills have been minimal since the install.
Christine E.
Good company with reasonable pricing. The installation went smoothly and the system is performing as expected. Communication was solid throughout the process.
Alan W.
Decent experience overall. The design consultation was thorough and the crew was skilled. The system has been running well. Would recommend getting a detailed walkthrough of the contract terms.
Frequently Asked Questions About Solar.IQ
What services does Solar.IQ offer?
Solar.IQ offers Solar Installation, Battery Storage, Solar Design, Maintenance.
Is Solar.IQ NABCEP certified?
Yes, Solar.IQ is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Solar.IQ serve?
Solar.IQ serves Salt Lake City, North Salt Lake, Bountiful, Ogden, Provo, Park City, Sandy. They are based in Salt Lake City with a service radius of 120 km.
What warranty does Solar.IQ offer?
Solar.IQ offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar.IQ's customer reviews?
Solar.IQ has a 4/5 rating based on 24 customer reviews. They are well-regarded by their customers.
How long has Solar.IQ been in business?
Solar.IQ was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Salt Lake City
Get a Free Solar Quote from Solar.IQ
Fill in your details and we'll connect you with Solar.IQ.
Quote request sent!
Solar.IQ will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile