Solar-Rise
MCS-accredited independent solar PV partnership serving Brighton, Hove, and Sussex since 2011
15+
Years in Business
224
Customer Reviews
50 km
Service Area
2-10
Employees
SurgePV Score
About Solar-Rise
Solar-Rise is an MCS-accredited solar installation partnership based in Brighton, founded in 2011 by Stephen Boakes and Paul O’Reilly. The business combines Stephen’s extensive experience as a carpenter-builder with Paul’s qualifications as a NAPIT Part P electrician, giving them a well-rounded approach to solar PV installation that covers both structural and electrical aspects of every project.
The company has built a strong reputation across Brighton, Hove, and the wider Sussex area, earning a 9.93 out of 10 rating on Checkatrade from 224 reviews over more than 12 years of membership. Solar-Rise holds MCS certification, meaning all systems they install qualify for the Smart Export Guarantee (SEG), and they are also members of the Renewable Energy Consumer Code (RECC). Their services cover residential and commercial solar PV installations, system maintenance, and ongoing monitoring support.
As a small, owner-operated partnership, Solar-Rise provides a personalised service that larger firms often cannot match. Both founders live locally in Brighton, which allows them to offer responsive aftercare and maintain close relationships with their customers. They also carry out electrical rewiring and other electrical works alongside their solar installation services.
Service Area
Solar-Rise serves the following areas within a 50 km radius:
Contact Information
Are you Solar-Rise?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
224 reviews
Sarah T
Stephen and Paul were brilliant throughout the whole process. Very knowledgeable and took time to explain everything. The installation was neat and tidy, and the system is performing exactly as they predicted.
Mark H
Solar-Rise gave us honest, straightforward advice without any hard sell. The installation was completed quickly and professionally, and they even came back to check everything was working perfectly.
Jenny L
Excellent service from start to finish. They provided a thorough survey and the installation team were polite, efficient and left everything spotless. Highly recommend.
Frequently Asked Questions About Solar-Rise
What services does Solar-Rise offer?
Solar-Rise offers Solar Installation, Maintenance, Monitoring.
Is Solar-Rise MCS certified?
Yes, Solar-Rise is MCS certified and also holds NAPIT, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Solar-Rise serve?
Solar-Rise serves Brighton, Hove, Lewes, Hassocks, Worthing. They are based in Brighton with a service radius of 50 km.
What warranty does Solar-Rise offer?
Contact Solar-Rise directly for their current warranty terms.
How are Solar-Rise's customer reviews?
Solar-Rise has a 4.9/5 rating based on 224 customer reviews. Customers consistently rate them highly.
How long has Solar-Rise been in business?
Solar-Rise was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in Brighton
Get a Free Solar Quote from Solar-Rise
Fill in your details and we'll connect you with Solar-Rise.
Quote request sent!
Solar-Rise will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile