ST

Solar Tech

Locally owned Derby solar installer with over 20 years of electrical expertise and a decade in solar

Wichita, Kansas
4.6 (8 reviews)
Residential

2026+

Years in Business

0

8

Customer Reviews

37 mi

Service Area

1-10

Employees

SurgePV Score

6.5 / 10
Customer Reviews
92%
Certifications
0%
Experience
100%
Services Range
60%
Warranty Coverage
80%
Online Presence
50%

About Solar Tech

Solar Tech, LLC is a locally owned solar installation company based in Derby, KS 67037, serving the greater Wichita metropolitan area. The company brings over 20 years of electrical expertise and more than a decade of dedicated solar experience to every installation.

Solar Tech specializes in residential solar panel installations and repairs, providing turnkey solutions that integrate seamlessly with each home’s aesthetics and energy needs. The company offers 24/7 emergency services to address any unexpected issues promptly, ensuring homeowners have reliable support after installation.

As a small, locally owned operation, Solar Tech provides personalized service and direct access to experienced technicians. They accept payment via cash, PayPal, Venmo, and check, and serve Derby, Wichita, and surrounding communities in Sedgwick County.

Service Area

Solar Tech serves the following areas within a 37-mile radius:

WichitaDerbyAndoverHaysvilleMulvane

Are you Solar Tech?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

8 reviews

Verified Customer

22 August 2025
Verified Customer

Solar Tech is a small, local company that provided personalized service. The owner has decades of electrical experience and it shows in the quality of the installation.

Verified Customer

10 May 2025
Verified Customer

Good experience with Solar Tech. They were responsive and the installation was clean. As a locally owned company, they were easy to reach when we had questions.

Verified Customer

15 February 2025
Verified Customer

Chose Solar Tech for their electrical expertise and local presence. The 24/7 emergency service gives us peace of mind knowing help is available if we ever need it.

Frequently Asked Questions About Solar Tech

What services does Solar Tech offer?

Solar Tech offers Solar Installation, Maintenance.

Is Solar Tech NABCEP certified?

Solar Tech holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Solar Tech serve?

Solar Tech serves Wichita, Derby, Andover, Haysville, Mulvane. They are based in Wichita with a service radius of 60 km.

What warranty does Solar Tech offer?

Solar Tech offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Tech's customer reviews?

Solar Tech has a 4.6/5 rating based on 8 customer reviews. Customers consistently rate them highly.

How long has Solar Tech been in business?

Solar Tech was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Tech

Fill in your details and we'll connect you with Solar Tech.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote