SW

Solar Wave

Owner-operated Denver solar installer providing high-quality residential and commercial systems with personal service

Aurora, Colorado
5 (15 reviews)
Verified
Residential Commercial

8+

Years in Business

0

15

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

8.4 / 10
Customer Reviews
100%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
100%

About Solar Wave

Solar Wave is an owner-operated solar installation company based at 2301 Blake Street, Suite 100, in Denver, Colorado, serving Aurora and the greater Denver metro area. The company is run by owner Steven, who works directly with each customer from the initial consultation through system design, installation, and follow-up.

Solar Wave provides residential and commercial solar installations including grid-tied systems, off-grid systems, and battery storage solutions. The company offers cleaning and maintenance services, energy consultations, and financing assistance. Their hands-on approach means customers work directly with the owner throughout the entire project.

The company has earned a 5.0-star rating as EcoWatch’s Best Local Installer designation and maintains BBB accreditation. Solar Wave serves Aurora, Denver, Centennial, and surrounding communities in the Denver metro area.

Service Area

Solar Wave serves the following areas within a 50-mile radius:

AuroraDenverCentennialEnglewoodLittletonParker

Are you Solar Wave?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Solar Design
Energy Audit

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

15 reviews

Scott W.

5 September 2025
Verified Customer

Working directly with the owner Steven made all the difference. He was there from the initial consultation through the final inspection. Truly personalized service.

Ashley P.

12 June 2025
Verified Customer

Solar Wave designed a great system for our Aurora home. The off-grid capabilities were exactly what we wanted. Steven is knowledgeable and responsive.

Derek M.

18 March 2025
Verified Customer

Best solar company in the Denver metro area. Owner-operated means you get quality attention from start to finish. Our system has been performing above expectations.

Frequently Asked Questions About Solar Wave

What services does Solar Wave offer?

Solar Wave offers Solar Installation, Battery Storage, Maintenance, Solar Design, Energy Audit.

Is Solar Wave NABCEP certified?

Solar Wave holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Solar Wave serve?

Solar Wave serves Aurora, Denver, Centennial, Englewood, Littleton, Parker. They are based in Aurora with a service radius of 80 km.

What warranty does Solar Wave offer?

Solar Wave offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Wave's customer reviews?

Solar Wave has a 5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Solar Wave been in business?

Solar Wave was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Solar Wave

Fill in your details and we'll connect you with Solar Wave.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote